Model NO.
XNFT-011
Cascade Level
Three
Driving Type
AC Elevator
Railing Form
EX-EN
Step Road Linetype
Linear
Escalator Type
Indoor Escalator
Escalator Usage
Shopping Mall, Supermarket
Energy Saving Grade
a+++
Escalator Truss Color
White, Blue
Escalator Truss Material
Square Pipe
Escalator Truss Welding
En 1090-1:2009+A1:2011
Escalator Step
Stainless Steel, Aluminum
Escalator IP Grade
IP21
Electronic Parts IP Grade
IP65
Escalator Running
Single Speed up &Down Reversible
Transport Package
1 Set One 40hq Container
Specification
EN115, GB16899-2011
Trademark
SYNEY or OEM
Origin
Zhejiang, China
HS Code
8428400000
Production Capacity
11000 Sets/Year
Type:
Light
Load Capacity:
9000 Persons/H
Use of Occasions:
Indoor Type
Speed:
0.5M/S
Slope Angle:
30°
Width of Stair:
1000mm
Product description
High Quality Escalator Passenger Conveyor (XNFT-011)
Safe, pretty and efficient, the distinctive Syney escalator displays construction class and style, making customers better enjoy their shopping.
Escalator safety measures
Functions
Production and shipping
Production and assembling
Packing and shipping
Certificates
CE Certificate of escalator and moving walk/ passenger conveyor
CE Certificate of energy-efficiency of lifts: A+++
EAC Certificate of escalator and moving walk/ passenger conveyor
Company Profile
No rejected raw material will be accpeted!
When raw material comes to factory, QC department will check all the materials, once any fault items found, it will be returned to suppliers at once. Only qualified material will get into raw material warehouse.
Production management
Every week, production department will make the production plan and update the schedule of online products. There is daigital board in each workshop showing the production plan everyday. In this way, from workers to managers all clearly know which project is online now.
Every moring, managers will guide the workers to run for 15 minutes first to refresh. Then check the machines status before operation and check again after one day job.
Packing
All parts are packed in solid plywood boxes, which can stand long time sea shipping and fumigation free. For some important parts like control cabinet, door operator and motor, parts will be covered by a strong film first, with desiccant, before put into boxes.
Quality control
1) All raw materials will be checked before get into warehouse. And bulk electronic product do sampling inspection. All parts must have qualified certificate from suppliers. QC1 is responsible for this.
2) During production stage, QC2 will check commissioning for each elevator, escalator and moving walks.
3) After elevator and escalator finished, QC3 will test the match of elevator motor and control cabinet, and the running condition of escalator and moving walks.
4) After packed, QC4 will check package condition for each parts, and takes photo for further reference.
5) When delivery, QC5 will check if all parts packed in container to avoid any missing, and takes photo for further reference.
Projects
High Quality Escalator Passenger Conveyor (XNFT-011)
Safe, pretty and efficient, the distinctive Syney escalator displays construction class and style, making customers better enjoy their shopping.
Escalator | Indoor and Outdoor |
Travel Height | H≤30000mm |
Step Width | 600mm, 800mm, 1000mm |
Inclined Degree | 35°, 30° |
Speed | 0.5m/s, 0.65m/s |
Escalator Width | 1260mm, 1460mm, 1660mm |
Noise | ≤65dB |
Vibration | ≤35cm/s² |
Flat step | 2 flat step, 3 flat step, 4 flat step |
Running | Single speed up &down reversible |
Delivery | 40ft high container |
Power Supply | Power 380V , 50Hz Three Phase Five Wire System Lighting 220V, single phase |
Energy Saving Function | VVVF, Auto start stop |
Escalator safety measures
Functions
Standard safety functions | |||||
1 | Emergency Stop Button | Yes | 19 | Machine Room Protect Board | Yes |
2 | Handrail Entry Contact | Yes | 20 | Step Light | Yes |
3 | Broken Step Chain Protection | Yes | 21 | Skirt Panel Contact | Yes |
4 | Comb Plate Contact | Yes | 22 | Step Yellow Safety Line | Yes |
5 | Inspection Socket | Yes | 23 | Alarm Bell When Start | Yes |
6 | Phase Failure and Phase Stagger Protection | Yes | 24 | Floor Plate Open Device | Yes |
7 | Step Sag Contact | Yes | 25 | Alarm Signs | Yes |
8 | Stop Button | Yes | 26 | Main Driving Chain Broken Protect Device | Yes |
9 | Main Power Switch | Yes | 27 | Overspeed Lowspeed Protection | Yes |
10 | Circuit Grounding Device | Yes | 28 | Step Static-free Device | Yes |
11 | Non-operational Reversal Safety Device | Yes | 29 | Handrail Belt Speed Detect Protection | Yes |
12 | Overload Protect | Yes | 30 | Floor Plate Open Detect Device | Yes |
13 | Portable Lamp and Socket | Yes | 31 | Step Missing Detect Protection | Yes |
14 | Handrail Belt Antistatic Device | Yes | 32 | Working Brake Open Detect Device | Yes |
15 | Traction Flywheel Cover Open Detect Switch | Yes | 33 | Skirt Panel Anti Clamp Device | Yes |
16 | Maintenance Power Supply Socket | Yes | 34 | Working Brake | Yes |
17 | Step Anti Bounce Device | Yes | 35 | Auto Lubricating Device | Yes |
18 | Safety Signs | Yes | |||
Optional functions | |||||
1 | Blocking device | ○ | 8 | Handrail lightening | ○ |
2 | Anti-climb device | ○ | 9 | Direction indicator | ○ |
3 | Anti-climb device is Not preset. | Yes/No | 10 | Oil-water separator | ○ |
4 | Vertical protect board | ○ | 11 | Liquid level switch | ○ |
5 | Handrail disconnect protect device | ○ | 12 | Heating device | ○ |
6 | Brake shoe wearing detection | ○ | 13 | Cladding | ○ |
7 | Auxiliary brake | ○ |
Production and shipping
Production and assembling
Packing and shipping
Certificates
CE Certificate of escalator and moving walk/ passenger conveyor
CE Certificate of energy-efficiency of lifts: A+++
EAC Certificate of escalator and moving walk/ passenger conveyor
Company Profile
SYNEY is the leading elevator & escalator manufacturer in China. Our main products include passenger elevator, freight elevator, goods lift, panoramic elevator, observation lift, hospital bed elevator, villa home lift, escalator, waving escalator and moving walk.etc.
Depending on advanced technologies, modern equipments, standardized management, and perfect marketing customer service network, the business of Syney Elevator has been improving steadily, not only covers the whole country, but also has been sold to Russia, Middle East, Southeast Asia, Korea and America, etc, becoming one of elevator enterprises with the highest potential.
The enterprise has two manufacturing factories. The registered capital is USD 35 million, covering nearly 99000 square meters, with over 600 employees. Among them, there are over 200 engineering technicians and nearly 50 senior managers.
From the raw material getting into factory to finished products getting out to customers, Syney has a strict operation system to control each steps.Depending on advanced technologies, modern equipments, standardized management, and perfect marketing customer service network, the business of Syney Elevator has been improving steadily, not only covers the whole country, but also has been sold to Russia, Middle East, Southeast Asia, Korea and America, etc, becoming one of elevator enterprises with the highest potential.
The enterprise has two manufacturing factories. The registered capital is USD 35 million, covering nearly 99000 square meters, with over 600 employees. Among them, there are over 200 engineering technicians and nearly 50 senior managers.
No rejected raw material will be accpeted!
When raw material comes to factory, QC department will check all the materials, once any fault items found, it will be returned to suppliers at once. Only qualified material will get into raw material warehouse.
Production management
Every week, production department will make the production plan and update the schedule of online products. There is daigital board in each workshop showing the production plan everyday. In this way, from workers to managers all clearly know which project is online now.
Every moring, managers will guide the workers to run for 15 minutes first to refresh. Then check the machines status before operation and check again after one day job.
Packing
All parts are packed in solid plywood boxes, which can stand long time sea shipping and fumigation free. For some important parts like control cabinet, door operator and motor, parts will be covered by a strong film first, with desiccant, before put into boxes.
Quality control
1) All raw materials will be checked before get into warehouse. And bulk electronic product do sampling inspection. All parts must have qualified certificate from suppliers. QC1 is responsible for this.
2) During production stage, QC2 will check commissioning for each elevator, escalator and moving walks.
3) After elevator and escalator finished, QC3 will test the match of elevator motor and control cabinet, and the running condition of escalator and moving walks.
4) After packed, QC4 will check package condition for each parts, and takes photo for further reference.
5) When delivery, QC5 will check if all parts packed in container to avoid any missing, and takes photo for further reference.
Projects
Send Message