Hot Search: 195/70r15c  crane  TBR  geely  rims  tractor  250cc motorcycle  truck tire  atv quad  atv tire 

Sc200 Construction Machinery Elevator, Machinery, Machinery Hoist

Supplier Shandong Xingdou Intelligent Equipment Co., Ltd.
Price $15000.00 / Piece
Availability In Stock
Mini Order:
+-
Subtotal: $15000

Purchase details

Payments:

Tax:

Tax Included 

Returns&Refunds:

Eligible for refunds within 30 days of receiving products. returns and refunds 

 
Model NO.
SC200/200
Transport Package
Container
Specification
SC200/200, SC150/150, SC100/100
Trademark
xingdou
Origin
China
HS Code
8428109000
Production Capacity
3000sets / Year
Cage:
3X1.3X2.1m 3X1, 5X2.1m(Changenable with Required)
Cage Dimension:
3X1.3X2.2m 3X1, 5X2, 2m(Changenable with Required)
Max.Load:
2*2000kg
Thickness:
4.5mm, 6mm, 8mm, 10mm
Mast Section Size:
0.65m*0.65m*1.508m, 0.8m*0.8m*1.508m
Height Limited:
250meters
construction of high buildings,TV towers,bridges,water towers,power stations and large chimneys.They can efficiently vertically carry building materials and persons. 1. Latest design,light structure,stable running,easy to assemble &,disassemble large lifting height and carriage capacity. 2. On the top of carriage,there are hanging rods and guides & top wheels canbe easily installed or dismantle 3. Safety Devices: Speed Limmiter, Double High Limmiter Protectors,Rope Protector,Load-Limmited Protector,Door Lock. 4. The Maximum installation height is 150m(can be increased in accordance with customer's requirement).As the installation height is above 100m,the additional cable block and tackle is needed.The layout of the driving devices can be inside-cage type and on-top of cage type.
 
 
Main technical parameters of building elevator common models: 
 

Characteristic

Model

Rated Loading

Lifting Speed

Motor Power

 
Double cabin

SC200/200

 2×2000kg

33m/min

2×(3×11kw)

SC150/150

 2×1500kg

33m/min

2×(2×15kw)

SC100/100

 2×1000kg

33m/min

2×(2×11kw)

 
Single cabin

SC200

    2000kg

33m/min

3×11kw

SC150

    1500kg

33m/min

2×15kw

SC100

    1000kg

33m/min

2×11kw

 
Protective Measures of building elevator :
 
1. A Master switch On the operation board: When the button closed, unexpected action to other buttons can not let cabin working.
2. Anti-falling safety device (with Centrifugal breaking system ): When all other protection device losing action, it can brake the cabin from falling. 
3. Mechanical inter-locking door: when the cabin running it can  close by itself from protecting people from dropping. 
4. Overload calling device.   
5. upper and lower travel limit: They can limit the cabin  go over the top mast.  
6. The top mast section have no rack in order to limit the cabin overrunning and dropping . 
7. Manual button: You can operate the botton to let the cabin go down when interruption of power supply .
8. Emergency switch: When the cabin losing control and over-runing, you can operate the button.
 
 
 
 
 Contact Details:
Mr. Seagle Yang ( 86-13854171919)
Jinan Beidou Construction Works Machinery Co.,Ltd
Tel: 0086-531-83821797                    Fax: 0086-531-83821797
                         http://sdxingdou.en.made-in-china.com
 
 
Send Message
Message Type
*Content
*Your Name  
*Tel
*Email
* Captcha  
You May Like
Related Search: Sc200 Construction Machinery Elevator Machinery Machinery Hoist Vehicles Elevator & Funicular Car Construction Elevator