Hot Search: lining  mr333501  perfume  aluminum  od127.7mm  250cc motorcycle  truck tire  atv quad  atv tire  car lift 

1ton 2ton Passenger Hoist Man Lift for People and Materials Construction Lift, Construction Lift, Building Lift

Supplier Shandong Xingdou Intelligent Equipment Co., Ltd.
Price $8500.00 / Piece
Availability In Stock
Mini Order:
+-
Subtotal: $8500

Purchase details

Payments:

Tax:

Tax Included 

Returns&Refunds:

Eligible for refunds within 30 days of receiving products. returns and refunds 

 
Model NO.
SC300, SC250, SC200, SC100, SC50
Sling Type
Chain
Lift Drive / Actuation
Electric Motor
Lift Mechanism
Rack and Gear
Attendant
With Attendant
Deceleration Device
With Deceleration Device
Elevator Door
Straight Fractional Door
Cage
Double Cage(with Operation Cabin or No Cabin)
Wall-Tie
1.7-2.0m,1.9-2.5m, 2.2-2.6m, 2.9-3.6m
Mast Section Size
650X650X1508m,450X450X1508mm, 900*650*1508mm
Rated Lifting Speed
36m/Min, 40m/Min, 46m/Min, 63m/Min, 80m/Min
Max Erection Height
250m, 400m
Main Electrical System
PLC Common Type, Vfc Advanced Type
Cage Dimension
3*1.5*2.2m, 3*1.3*2.2m, 3.2*1.5*2.2m(OEM)
Motor Power
2X11kw, 2X13kw, 2X15kw, 3X11kw, 3X15kw OEM
Mast Section Weight
145-180kg (Double Racks)
Application
Bridge Hoist, Power Tower Hoist, Chimney Hoist,
Electrical Component
World Leading Brand
Motor
Chinese Leading Brand or World Famous Brand
Transport Package
Container
Specification
SC100, SC200, SC150, SC100Z, SC150Z, SC200Z
Trademark
XINGDOU
Origin
China
HS Code
84281090
Production Capacity
1000sets / Year
After-sales Service:
Oversea Service
Warranty:
12 Months
Type:
Rack and Gear
Load Capacity:
2T - 3T
Speed:
40M/Min - 60M/Min
Usage:
Construction Hoist

       Best Quality 1Ton 2ton Passenger hoist man lift for people and materials construction lift
Best Quality 1ton 2ton Passenger Hoist Man Lift for People and Materials Construction Lift
Technicaldata(OEM): CE approved.

Product TypeModelLifting Speed(m/min)Max Height(m)Drive UnitSafety DeviceElectronic Control Systerm
Direct driving PLCSC100/10033 m/min150m2*11KWSAJ30-1.2PLC
SC150/15033 m/min150m2*15KWSAJ40-1.2PLC
SC200/20033 m/min150m3*11KWSAJ40-1.2PLC
Low Speed VFDSC100/100L0-40 m/min250m2*11KWSAJ40-1.230KW VFD
SC150/150L0-40 m/min250m2*13KWSAJ40-1.230KW VFD
SC200/200LA0-33 m/min250m2*13KWSAJ40-1.230KW VFD
SC200/200LB0-40 m/min250m2*15KWSAJ40-1.237KW VFD
SC200/200LC0-46 m/min250m3*11KWSAJ40-1.237KW VFD
Mid Speed VFDSC200/200MA0-55 m/min350m2*19KWSAJ40-1.445KW VFD
SC200/200MB0-60 m/min350m2*23KWSAJ40-1.455KW VFD
SC200/200MC0-63 m/min350m3*15KWSAJ50-1.455KW VFD
SC200/200MD0-72 m/min350m3*19KWSAJ50-1.675KW VFD
High Speed VFDSC200/200HA0-80 m/min450m3*23KWSAJ50-1.675KW VFD
SC200/200HB0-90 m/min450m3*26KWSAJ50-2.090KW VFD
SC200/200HC0-100 m/min450m3*32KWSAJ50-2.0110KW VFD
SC200/200HD0-120 m/min550m3*19KWSAJ50-2.475KW VFD

Best Quality 1ton 2ton Passenger Hoist Man Lift for People and Materials Construction Lift
Manufacturing Technology

A. Production process:Strict material selection-  blanking- inspection - welding-inspection- Blasting - inspection -Baking finished or galvanized- inspection -Finished product

Best Quality 1ton 2ton Passenger Hoist Man Lift for People and Materials Construction Lift

Best Quality 1ton 2ton Passenger Hoist Man Lift for People and Materials Construction LiftBest Quality 1ton 2ton Passenger Hoist Man Lift for People and Materials Construction Lift
Main CONSTRUCTION LIFT Parts: Cage/Cabin


1. bottom and roof of Cage adopt  trapezoidal frame   
2. Bottom and the roof are full symmetry  
3. The plane of symmetry are connected by  Bending plate,  Bending channel and  square pipe which make it  firm, straight and balance in use.  
4. The wall around cage can be fixed by Punched  Aluminium plate, Punched zinc plate, steel wire mesh.
5. Surface Treatment: Blasting, Baking finished,Galvanized
Best Quality 1ton 2ton Passenger Hoist Man Lift for People and Materials Construction LiftBest Quality 1ton 2ton Passenger Hoist Man Lift for People and Materials Construction Lift
Main CONSTRUCTION LIFT Part: Mast Section

1. Steel plates are bented of U-shape to strengthen the mast section.
2. Mast section with galvanized coat or heat spray coat can be chosen.
3. High quality steel plate Q345B bended by special machine: Thickness 4.5mm.  

4. Welded steel tube Q345B and seamless steel tube 20# are also available: Ø76*4.5mm or Ø89*4.5mm 

(Thickness of 6mm or 8mm is also available).

5. 650*650*1508mm is the most common size fits for clients. Other model of mast section can choose: 

450*450*1508mm, 650*900*1508mm,800*800*1508mm


Best Quality 1ton 2ton Passenger Hoist Man Lift for People and Materials Construction Lift
Best Quality 1ton 2ton Passenger Hoist Man Lift for People and Materials Construction Lift
About us:

Shandong Xingdou Intelligent Equipment Co.,Ltd in the country has 26 overseas
offices, the country has nearly 200 sales outlets, establish a sound system of the service network.

Best Quality 1ton 2ton Passenger Hoist Man Lift for People and Materials Construction LiftBest Quality 1ton 2ton Passenger Hoist Man Lift for People and Materials Construction Lift
After-sale services
Best Quality 1ton 2ton Passenger Hoist Man Lift for People and Materials Construction Lift

1.Quality Assurance:
   Good quality is assured by advanced manufacturing technology.and all products will be checked by our quality-control manager.
2.Excellent Package:
   We provide standard,strong,protective package for our products to prevent is from outer damage.
3.Quickly Response:
   Detailed information,specific model and price of price of products will be provided quickly after receiving your inquiry.

 

 
Send Message
Message Type
*Content
Your Name  
Tel
*Email
* Captcha  
You May Like