Model NO.
Ez Winch Rope-H
Type
Electric Winch
Power Type
Permanent-magnet DC
Pull Direction
Backward
Manual Winch Type
T10
Electric Winch Model
ATV
Working Voltage of Electric Winch
High Voltage
Hydraulic Winch Type
Medium Pressure
Brand
Winch
Applicable Environment
Mountain Road
Certification
CE
Customized
Available
Trademark
Ropers
Transport Package
as Request
Specification
12 strands
Origin
China
HS Code
56074900
EZ Winch Rope Is1/7th of the weight of steel cable, but Is impressively
up to 45% stronger. This brings the EZ Winch Rope more convenient
and safer then steal wire cable. Then makes EZ Winch Rope great for
rescues in water, on steep hills or in mountains, where weight really
matters.
Features;
"100% HMPE"
Floats
Water non-absorption
Ultra-high strength
Ultra-low elongation
light weight
UV resistance
Stainless Steel Thimble
Heavy Duty Sling Hook
Applications;
Suitable for rescues in
water, on steep hills or in
mountains, alrbome missions
ATV&UTV
Diameter | Average Break load | Length | ||||
mm | inch | kg | lb | kn | M | Feet |
5 | 3/16 | 2495 | 5500 | 15,30,45 | 50,100,150 | |
6 | 1/4 | 3995 | 8810 | 15,30,45 | 50,100,150 | |
8 | 5/16 | 6290 | 13870 | 15,30,45 | 50,100,150 | |
9 | 3/8 | 8990 | 19820 | 15,30,45 | 50,100,150 | |
10 | 7/16 | 10920 | 24080 | 15,30,45 | 50,100,150 | |
12 | 1/2 | 15500 | 34180 | 15,30,45 | 50,100,150 |
® STANDARD OPERATING PROCEDURE
1.Customer selected ROPERS's product models.
2.Customer Informed ROPERS the models number and specifications by e-
Mail or fax, then advise the requirements clearly and other details, such
As:Tensile strength, supporting documents, packaging (OEM's customer
Applicable), the place of receipt, mode of transport, payment terms and
Trade term.
3.ROPERS will respond and send the sample out for approval within
Seven days.We will take note if there is any change.
4.After getting the approval of sample, please send purchase order to
ROPERS by fax or e-mail.We will respond and confirm within 2 days.
5.Our Sales pass the order information to production line.Production Line
Will Inform Material Control Department and Quality Assurance department
To go to next step.
6.Materials Control Department will use batch number to control the
use of raw materials and provide more detail products traceability.
7.After producing the first product, Production line and Quality Assurance
will test the product and retain the testing record.
8.After sample approvals for trial run, we will go into mass production. The
period is about 10 working days. In accordance with ISO procedures.
9.After completion product production, ROPERS will do FQC to ensure that
product's specification and packaging meet the requirements of customer's.
The process takes about 20 to 30 working days.
10.ROPERS will inform customers cargo released date.