4.00-12,4.50-12 ,5.00-12 tiller tyre for Japanese tractors
Popular model No. in our factory
Tractor agriculture tires 5.00-12
1.Superior quality and the long-using life
2.The traction tyre with good drive powder and hole power
3.Good resistance to wear abrasion and aging, and it could help to make the machine work more efficient.
4.This low-profile and sturdy tyre endures speed well,resulting in quick transportation.
5.Long-wearing,trae-resistance and cracking resistance.
Size | Patt.no | Rim width | Ply rating | kpa | SW(mm) | OD(mm) |
4.00-12 | R1 | 3.00D | 4 | 240 | 112 | 535 |
5.00-12 | R1 | 4.00E | 4/6 | 200 | 145 | 590 |
5.50-17 | R1 | 4.50E | 4/6 | 250 | 150 | 720 |
6.00-12 | R1 | 4.50E | 4/6 | 180 | 165 | 640 |
6.00-14 | R1 | 4.50E | 4/6 | 250 | 165 | 690 |
6.00-16 | R1 | 4.50E | 6/8 | 250 | 165 | 745 |
6.50-16 | R1 | 4.50E | 6/8 | 250 | 180 | 765 |
7.50-16 | R1 | 5.50F | 6/8 | 210 | 205 | 810 |
7.50-20 | R1 | 5.50F | 4/6/8 | 210 | 205 | 910 |
8.3-20 | R1 | W7 | 4/6/8 | 240 | 210 | 895 |
8.3-24 | R1 | W7 | 6/8 | 240 | 210 | 995 |
9.50-16 | R1 | W8 | 4/6/8 | 325 | 250 | 860 |
9.5-20 | R1 | W8 | 4/6/8 | 210 | 240 | 950 |
9.5-24 | R1 | W8 | 6/8/10 | 210 | 240 | 1050 |
11.2-24 | R1 | W10 | 6/8/10 | 240 | 285 | 1105 |
11.2-28 | R1 | W10 | 4/6/8 | 180 | 285 | 1205 |
11.2-38 | R1 | 10.00 | 4/6 | 120 | 284 | 1459 |
12.4-24 | R1 | W11 | 4/6/8 | 230 | 315 | 1160 |
12.4-28 | R1 | W11 | 4/6/8 | 230 | 315 | 1260 |
12-38 | R1 | W11 | 4/6/8 | 230 | 315 | 1515 |
13.6-24 | R1 | W12 | 4/6/8/10 | 200 | 345 | 1210 |
13.6-28 | R1 | W12 | 4/6/8/10 | 200 | 345 | 1310 |
13.6-38 | R1 | W12 | 4/6/8/10 | 200 | 345 | 1565 |
14.9-24 | R1 | W13 | 6/8/10 | 180 | 378 | 1265 |
Our Workshop
FAQ:
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.