Model NO.
CY-K25
Type
Compressor Car Refrigerator
Capacity
25L
Voltage
DC 12V/24V, AC100V-240V
Refrigeration Temperature Scope
-20ºC~20ºC
Certification
CE
Shape
Box Type (Open Upward)
Power Source
Electricity
Power Supply Type
DC&AC
Component
Semiconductor
Brand
Honcai
Product
Compressor Cooling Mini Fridge
Name
Fruit Mini Fridge Handle Mini Fridge
Feature
Home Mini Fridge House Mini Fridge
Item
Ice Drink Cooler Box
Color
White
Style
Insulated Cooler Lunch Box
Key
Insulated Cooling Ice Box
Usage
Insulated Lunch Cooler Box
Keyword
Insulated Plastic Ice Cooler Box
Design
Insulin Needle Cooler Box
Description
Lunch Mini Cooler Box
Surface
Mini Beer Fridge Ce Approval
Applicantion
Mini Beverage Car Fridge
Function
Mini Car Cooler Fridge
Other Name
Mini Car Fridge Car Refrigerator
Trademark
Honcai
Transport Package
Carton Packing
Specification
585*335*350mm
Origin
Henan, China
HS Code
8418212000
Our Company
We are a professional manufacturer specialized in fridge/freezer/makeup fridge/mini fridge/car fridge.
All model have passed CE,ISO,CCC certification.
Product Parameters
Modle | CY-K25 |
Volume | 25L |
Power consumption | 45W |
Operational Voltage | DC12V/24V OR AC100-240V |
Principle of Refrigeration | Compressor refrigeration |
Outer size | 585*335*350mm |
Carton size | 65.4*40.4*42 cm |
Cooling | -20ºC~20ºC |
G.W (kgs) | 16kg |
Features:
*DC compressor refrigerator; AC to DC adaptor included.
*3.5 meter DC power cable included.
*Anti-leakage inner tank.Electroniccontrol.
* LED display.Fully insulated body. (Optional for LCD)
*Antivibration design; EXTRA ICE MAKING ZOE;
*OPTIONAL for APP control and/or rechargeable built-in battery /LG compressor
Detailed Photos
Certifications
Packing:
Our Factory
FAQ
1. What is your terms of packing?
Adopt Foaming plate and dust-proof bag; and export standard carton box; (Export standard wooden box and/or pullet available).
2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
3. How about your delivery time?
Generally, it will take 20 to 30 days after receiving your advance payment. The specific delivery time depends on the items and
the quantity of your order.
4. Can you produce according to the samples?
Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
5. What is your sample policy?
We can supply sample if we have stock, however, the sample cost and courier cost shall be on customers account.
6. Do you test all your goods before delivery?
Yes, 100% guarantee before delivery
7: Does your company agree distribution sales?
Yes. We have experience work with global distributors, and we have full policy. Pls do not hesitate to contact us.
Related Products