Hot Search: 195/70r15c  TBR  crane  tractor  250cc motorcycle  truck tire  atv quad  atv tire  car lift  cargo trailer 

Sojo Manufacturer 40-80kw EV Charger 200A Fast Charger Electric Car Charger

Supplier Hefei JOJO Fast Charge Technology Co.,Ltd.
Price $12000.00 / Piece
Availability In Stock
Mini Order:
+-
Subtotal: $120000

Purchase details

Payments:

Tax:

Tax Included 

Returns&Refunds:

Eligible for refunds within 30 days of receiving products. returns and refunds 

 
SCDE-40-80-Y1-DC
One Pile with Multiple Charges
Public Use
Floor Type
Normal Charge
CE/GB
1year Warranty
94% (Full Load)
155A
CCS 2* or GB
4G /Ethernet
3pH+N+PE(L1, L2, L3, N, PE)
SOJO or OEM
Cardboard Box
700*400*1550mm
China Anhui
Product Description
Company Profile:

      SOJO Electric Co., Ltd.,
1,Leading enterprises of power distribution industry in China

2,Wins"national Torch Program industrialization demonstration project certificate

3,The only enterprise pass KEMA certificate in China

Listed on Shenzhen Stock Exchange in April 2015.(Stock Code:300444)

4,Possess multiple international invention patents

5,Specializes in the R & D, production, sales and operation in new energy field

6,Owning a 350,000 m2 digital factory in middle of China

7,Set up in 2002 have rich experience in production

8,Annual output value over 5 billion RMB

9,Global Employees more than 2000 people

Product rule parameters:
 
1) The column type AC charging pile can be installed in outdoor operation, but the top of the equipment should be equipped with a canopy to prevent rainwater from directly drenching the equipment;

2) According to the installation position shown on the left, drill the expansion bolt installation holes, install the expansion bolts and waterproof rubber gasket in sequence, fix the AC pile on the column, install the waterproof rubber gasket on the top of the internal expansion bolts, fix it with nuts and then fix it with sealant;

3) Fix the gun line hook holder with screws on the center fixing hole of the column;

4) Ground the body reliably to avoid electric shock causing casualties;

5) The pile is usually made 20 centimeters high foundation, and the column is fixed on the foundation with expansion bolts.
 
NameParameters
Rated power40-80kw
Body size (H*W*D)
700*400*1550mm
 Input power connection3Ph + N + PE(L1, L2, L3, N, PE)
CertificationCE / GB
AC input voltage380 VAC ± 10%
Operating temperature
-20+50ºC
Ambient humidity
5%~95% No condensation
Maximum Output Current200A
Length of charging gunsNominal 5 meters
Number of charging gunsSingle gun/Double guns
Protection classIP54
Input power connection3Ph + N + PE(L1, L2, L3, N, PE)
AC input frequency50Hz
HMI7 inch LCD touch screen
RFID systemISO 14443 type A  MIFARE DESFire EV1
Communication ProtocolOCPP 1.6
Cooling methodForce air cooling
Safety standardsIEC 61851
Communications interfaceCAN/RS485/Ethernet
Current Limit Protection Value≥1.1le
Voltage stabilization accuracy≤±0.5
Stabilization accuracy≤±1
Static≤65dB
Module ConfigurationTriple Harmonization Module

Project case&Certificate:







Customer Service:

We can provide customers with professional product advice and purchase options.
 
All emails will be responded with in 24 hours during working days.
 
We have online customer service in English, Japanese.  You can communicate with ease, or contact us through email anytime.
 
All customers will get one-on-one service.


Storage and transportation of equipment:

There should be corresponding fastening measures during transportation to avoid strong vibration and bumps damaging the outer packaging of the equipment. Upon arrival, you should check whether there is any damage, if there is any transportation damage, you should negotiate with the transportation party and our company to solve the problem. After opening the box, you should immediately check whether the contents of the box are consistent with the packing list.

Packed equipment should be stored in a room with relative humidity ≤80% and ambient air temperature -10ºC~+40ºC. The storage place should be dry, clean, air circulation, and can prevent the intrusion of all kinds of harmful gases, it is strictly prohibited to store with corrosive substances in the same place.



Our factory:

FAQ
Q1.Are you a factory or trading company?
A: We are a professional manufacturer of new and sustainable energy applications .

Q2.What is the warranty?
A: 12 months. In this period, we will supply technical support and replace the new parts by free, customers are in charge of delivery.
Q3. What is your terms of payment?
A: T/T 50% as deposit, and 50% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q4. What is your terms of trade?
A: EXW, FOB, CFR, CIF, DAP,DDU,DDP
Q5. How about your delivery time?
A: Generally, it will take 3 to 7 working days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q6. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q7. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q8. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Send Message
Message Type
*Content
*Your Name  
*Tel
*Email
* Captcha  
You May Like
$15623.00
$8999.00
$4500.00
$186.00
$12000.00
$105.00
$178.00
$118.00
$28.90
$25400.00
$12.00
$85.00
$50.00
$250.00
Related Search: Gas Station & Charging Equipment EV Charging & Equipment
Home  |  About Us  |  Contact Us  |  Terms of Use  |  Privacy Policy  |  Billing Terms  |  Shipping Policy  |  Return & Refund Policy  |  Sitemap  |  Feedback  |