Hot Search: 195/70r15c  crane  TBR  geely  tractor  250cc motorcycle  truck tire  rims  atv quad  atv tire 

Sojo Manufacturer 320kw 500A EV Charger Floor Standing DC Fast Charge

Supplier Hefei JOJO Fast Charge Technology Co.,Ltd.
Price $15623.00 / Piece
Availability In Stock
Mini Order:
+-
Subtotal: $156230

Purchase details

Payments:

Tax:

Tax Included 

Returns&Refunds:

Eligible for refunds within 30 days of receiving products. returns and refunds 

 
SCDE200-320-DC
One Pile with Multiple Charges
Public Use
Floor Type
Quick Charge
3pH+N+PE(L1,L2, L3,N,PE)
GB or EU
250 a
7 Inch LCD Touch Screen
Ocpp 1.6
2 Year Warranty
94% (Full Load)
SOJO or Customized
Cardboard Box
800x800x2000mm
China
Product Description
Company Profile:

           SOJO Electric Co., Ltd.,
1,Leading enterprises of power distribution industry in China

2,Wins"national Torch Program industrialization demonstration project certificate

3,The only enterprise pass KEMA certificate in China

Listed on Shenzhen Stock Exchange in April 2015.(Stock Code:300444)

4,Possess multiple international invention patents

5,Specializes in the R & D, production, sales and operation in new energy field

6,Owning a 350,000 m2 digital factory in middle of China

7,Set up in 2002 have rich experience in production

8,Annual output value over 5 billion RMB

9,Global Employees more than 2000 people

Product rule parameters:
 
Description:

1,It can be installed on the foundation or on the ground, the mounting surface according to the above picture position pre-buried 4 M12 stainless steel bolts, require threads exposed to the ground 47-53mm

2,The installation surface should be cement hardened (the hardened area of single pile should not be less than 900mmX600mm)

3,Cement hardening installation surface needs to be leveled (to ensure that the installation surface level)

4,Stainless steel nuts must be used to install the M12 nuts of the anchor bolts.
 
NameParameters
Body size (H*W*D)
800x800x2000mm
Input power connection3Ph + N + PE(L1, L2, L3, N, PE)
AC input frequency50/60Hz
Power factor0.98 (full load)
Efficiency94% (full load)
Charging interfaceGB or  EU
Rated power60-400 kW
Output voltage200 ~ 1000 VDC
AC Input Voltage
AC380V±15%
operating temperature
-20+50ºC
relative humidity
≥94%
Maximum Output Current500A
Cable lengthNominal 5 meters
HM Interface7 inch LCD Touch screen
EV ComplianceDIN 70121/ISO 15118
Communication protocolOCPP 1.6
RFID systemISO 14443 type A  MIFARE DESFire EV1
 Internet connection4G /Ethernet
Number of charging gunsdouble guns
protection classIP54
Project case:
 


Certificate:



Customer Service:
We can provide customers with professional product advice and purchase options.
 
All emails will be responded with in 24 hours during working days.
 
We have online customer service in English, Japanese.  You can communicate with ease, or contact us through email anytime.
 
All customers will get one-on-one service.


Storage and transportation of equipment:

There should be corresponding fastening measures during transportation to avoid strong vibration and bumps damaging the outer packaging of the equipment. Upon arrival, you should check whether there is any damage, if there is any transportation damage, you should negotiate with the transportation party and our company to solve the problem. After opening the box, you should immediately check whether the contents of the box are consistent with the packing list.

Packed equipment should be stored in a room with relative humidity ≤80% and ambient air temperature -10ºC~+40ºC. The storage place should be dry, clean, air circulation, and can prevent the intrusion of all kinds of harmful gases, it is strictly prohibited to store with corrosive substances in the same place.



Our factory:

FAQ
Q1.Are you a factory or trading company?
A: We are a professional manufacturer of new and sustainable energy applications .

Q2.What is the warranty?
A: 12 months. In this period, we will supply technical support and replace the new parts by free, customers are in charge of delivery.
Q3. What is your terms of payment?
A: T/T 50% as deposit, and 50% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q4. What is your terms of trade?
A: EXW, FOB, CFR, CIF, DAP,DDU,DDP
Q5. How about your delivery time?
A: Generally, it will take 3 to 7 working days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q6. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q7. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q8. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Send Message
Message Type
*Content
*Your Name  
*Tel
*Email
* Captcha  
You May Like
$7999.00
$6544.00
$12500.00
$76.00
$5800.00
$389.00
$122.00
$155.00
$4500.00
$12000.00
$450.00
$820.00
$285.00
$5.00
Related Search: Gas Station & Charging Equipment EV Charging & Equipment
Home  |  About Us  |  Contact Us  |  Terms of Use  |  Privacy Policy  |  Billing Terms  |  Shipping Policy  |  Return & Refund Policy  |  Sitemap  |  Feedback  |