GBMRM12-04
at-Site
12 Months
GBM
Nude Packing
12cbm/25t
Shanghai China
Product Description
Product Description
wireless remote clamshel grab bucket for crances for loading bulk material
It is a merging of the radio remote control technology into the single rope grab for handling of bulk materials. It is particularly designed for operation with single-hook crane and ship crane, with reliable performance and easy operation procedures.The grab could be open and unload materials from any position in the air.
Parmeter
Model | SWL (t) | Dead weight (t) | Capacity (m3) | Wire rope diameter (mm) | Pulley | Overall dimensions(mm) | |||||
Diameter (mm) | Rate | A | B | C | D | E | |||||
GBM-C1 | 10 | 5 | 5 | 24 | 520 | 3 | 3635 | 3398 | 2430 | 3159 | 2450 |
GBM-C2 | 16 | 6.2 | 6 | 28 | 520 | 3 | 3720 | 3483 | 2500 | 3250 | 2700 |
GBM-C3 | 20 | 8 | 8 | 28 | 520 | 3 | 4008 | 3796 | 2600 | 3605 | 3000 |
GBM-C4 | 28 | 9.8 | 9 | 36 | 650 | 3 | 4159 | 3960 | 3000 | 3753 | 3200 |
GBM-C5 | 40 | 15 | 10 | 40 | 810 | 3 | 4596 | 4305 | 3300 | 3805 | 3200 |
GBM-C6 | 10 | 5 | 3.3-5.0 | 24 | 520 | 3 | 3635 | 3398 | 2430 | 3159 | 2450 |
GBM-C7 | 16 | 7 | 5.0-8.0 | 28 | 520 | 3 | 4008 | 3796 | 2600 | 3605 | 3000 |
GBM-C8 | 20 | 8 | 6.0-10.0 | 28 | 520 | 3 | 4325 | 4268 | 2877 | 3957 | 3000 |
GBM-C9 | 25 | 9.5 | 6.0-12.0 | 36 | 650 | 3 | 4110 | 3972 | 3030 | 3866 | 3500 |
GBM-C10 | 28 | 10.5 | 8.0-14.0 | 36 | 650 | 3 | 4110 | 3972 | 3030 | 3866 | 3800 |
GBM-C11 | 36 | 14.8 | 13.0-20.0 | 40 | 810 | 3 | 5033 | 4896 | 3520 | 4636 | 4000 |
GBM-C12 | 40 | 16 | 15.0-22.0 | 40 | 810 | 3 | 5033 | 4896 | 3520 | 4636 | 4400 |
Our Service
1.Pre-sale services:
a: Design customised project for clients.
b: Design and manufcture products according to clients special requirement.
c: Train technical personnel for clients.
2.Services during the sale:
a: Help clients to find reasonable freight forwarders ahead of delivery.
b: Help clients to draw solving plans.
3.After-sale services:
a:Assist clients to prepare for the construction scheme.
b:Install and debug equipment.
c:Train the first-lin operators.
d: Examine equipment.
e: Take initiative to eliminate the troubles immediately.
f:Provide techical exchanging.