JSXT0650
21cbm
ISO9001, Csc, CE/EU
Steel Structure
Tank Container
Cryogenic Valves
-196~+50 Degrees
Lr BV CCS
High Vacuum Multi-Layer
16bar
20'
36t
>10 Years
>20 Days
20FT
25 Years
Customized
12 Months
12 Months
6.058*2.438* 2.591
JSXT
by Frame or Bulk or Roro
6058*2438*2591MM
China
Product Description
Long Service Life 20ft T75 ASME Standard LOX LIN LAR LNG LCO2 ISO Tank Container for Sale
Tank containers can be 20/30/40 feet in size. Tank container volume mainly has 20/22/25/30/35/40/45/50/55cbm. Basic equipment includes side outlet, double-side loading and unloading, double pump box, double tool box, safety valve, temperature gauge, pressure gauge, emergency shut-off valve, fire extinguisher, static protection grounding belt, etc. For the safe use of liquid nitrogen products, we have carried out a number of tests on the liquid nitrogen tank, such as weld density test, heat treatment, water pressure measurement, and ray non-destructive testing.


Codes and regulations:
RID/ADR, IMDG, ASME VIII DIV 1-2017Ed; TIR;UIC;CSC;TC;FRA;CFR49;ISO 1496/3;ISO Standard 1161


Main material Cover | inside tank SA-240M 304 |
Main material Cover | outside tank Q345R |
Tank Shape | Column Shape,Horizontal |
Nominal Medium | 20500L |
Gross mass(kg) | 34000 |
Tare Weight(kg) | 11050kg |
Filling ratio | 95% / 85% |
Max. Allowed Working Pressure | 16Bar |
Design Pressure | 22Bar |
Baffles of the inner vessel | Two transvers baffles |
Design temperature(ºC) | -196 to 50 |
Type of insulation | High vacuum multi-layer |
Valve types for cryogenic tanks | cryogenic valves |
Safety Valve | DN25 PN2.5 DAH-25A1 |
Vaporator | DN25 |
Top inlet pipe | DN40 |
Bottom inlet/outlet pipe | DN40 |
Reflux tube | DN40 |
Liquid level gas phase tube | DN10 |
Liquid level liquid phase tube | DN10 |
Monitoring tube | DN10 |
Overall Size(Frame)/L*W*H/mm | 6058*2438*2591 |
ISO-cornercastings | 20'x8'x8'6" ISO dimensions |

1.This frame tank container should carry out all kinds of the test according to the GB / T16563-1996 and China Classificationm Society "Container Inspection Code".
2.Except for the pictures' mark, the type and size of the welded structure shall be in
accordance with GB / 985.1. The height of the weld foot and weld fillet is according to the thickness of the less thinner steel plate.There should not be crack, slag, porosity, or undercut, etc. on the surface of the welded joint.Weld seam surface will be inspected through the magnetic powder or penetration testing (preferred magnetic powder). Meet NB / t47013.4 (5) -2015, Class I qualified.
accordance with GB / 985.1. The height of the weld foot and weld fillet is according to the thickness of the less thinner steel plate.There should not be crack, slag, porosity, or undercut, etc. on the surface of the welded joint.Weld seam surface will be inspected through the magnetic powder or penetration testing (preferred magnetic powder). Meet NB / t47013.4 (5) -2015, Class I qualified.
3.The accessories for this tank container shall meet the corresponding standards of product quality certification,which can be carried out the air tightness test together with the tank after passing the re-examination and form a complete set then delivery from the factory;
4.Valve opening operation,should be able to withstand the pressure of the air tightness test , fully open, fully closed, flexible operation, no abnormal resistance, idling and so on;
5.All signs, brand names, stickers will be made according to the drawings after the competion of the painting; The area around the signs, brand names and rivets will be sealed with the sealant.
6.The vertical plane of the longitudinal centerline of the tank container shall be coincident with the vertical plane of the longitudinal centerline of the frame. The offset shall not exceed 5mm.
7. All supports of the connections between the tank and the frame should be thin welding, and welding firm and reliable, the weld seam surface shall not have cracks, undercut, stomatal, crater and splash.
8. Tank coating in line with the relevant provisions of JB / T4711-2003. After complete cleaning the rust of the outside carbon steel surface of the tank,coated two anti-rust primer, two white finish.
9. The tank needs to be replaced with nitrogen or vacuumed before leaving the factory.
(1) the use of nitrogen replacement treatment, the oxygen content after treatment is less than 3%, and keep the residual pressure 0.05Mpa ~ 0.1Mpar;
(2) the use of vacuum treatment, the vacuum after treatment is not less than 0.086Mpa.1010. Emergency cut-off device should be installed before the air tightness test, the test medium is air, the test pressure is 0.1Mpa;After the installation is complete,Emergency shut-off device should be done through emergency cut off and filter protection test, gas valve, liquid valve and boostervalve completely closed in 5S qualified, air source control valve rotation flexibility, no jamming phenomenon.
(1) the use of nitrogen replacement treatment, the oxygen content after treatment is less than 3%, and keep the residual pressure 0.05Mpa ~ 0.1Mpar;
(2) the use of vacuum treatment, the vacuum after treatment is not less than 0.086Mpa.1010. Emergency cut-off device should be installed before the air tightness test, the test medium is air, the test pressure is 0.1Mpa;After the installation is complete,Emergency shut-off device should be done through emergency cut off and filter protection test, gas valve, liquid valve and boostervalve completely closed in 5S qualified, air source control valve rotation flexibility, no jamming phenomenon.








Welcome inquiry anytime to get best offer !
1.Payment term: 100%T/T or LC payment
100%T/T, 30% deposit for production, pay the balance 70% before the shipment.
2. Warranty : 12 months
No warranty for consumable parts, but we will send you free consumable parts, on-board tools, wires, lamps, etc. before the shipment.
Free consultation service for life.
Technical repair and guidance questions, engineers can come to service
3.Delivery time: 15-45 working days
Check if the product is in stock or sufficient raw materials
Normal quantity order delivery time is 15 working days
Check if the product is in stock or sufficient raw materials
Normal quantity order delivery time is 15 working days
Big project need to check request delivery time and delivery details required
4.Services
4.Services
Welcome to visit our factory at any time
Order confirmation, drawing confirmation, details and requirements confirmation.
Production photos and videos are updated to customers every week
24 hours online for consult
24 hours online for consult
Provide support for post-parts demand, factory price direct delivery.
5. LOGO & Color:
factory recommend or as your request.
6.Quality control:
5. LOGO & Color:
factory recommend or as your request.
6.Quality control:
Our welding workers who have international welding certificate with good technically.We have QA&QC control in each production link, and will continue production after passing the inspection.
Various production line processes.





















