howo 20CBM 20000L Customized Heavy Street Water Bowser Tank Truck Road Cleaning Green Sprinkler Truck
Our sprinkler sprays forward (sprays) and sprays sideways, with side sprays, and a working platform behind the tank. A green sprinkler is installed on the platform. The sprinkler can be rotated in all directions and can be continuously adjusted into straight, heavy rain, light rain, drizzle. , With safety guardrail, equipped with high-quality high-power special sprinkler pump, the pump can self-prime and self-discharge, install a filter, with fire protection interface, can enter the water through a fire hydrant, with a self-flow valve, optional 20 meters green reel with the vehicle It can be sprayed with pesticides and metal paint of the tank.
Description of sprinkler pumps: High-power special-purpose sprinkler pumps, adopting internationally advanced Italian technology, have produced various series of special-purpose pumps in China for 50 years. The product quality is mature and reliable, the design is advanced and reasonable, and the use is convenient and fast. Long suction range, long service life, overcome the shortcomings of other sprinklers, such as being easily entangled with debris, low pressure, and slow water absorption, leading the domestic and international sprinkler pump industry standards, with a market share of 93%.
rear axle | HC16 double rear axle (drum) |
front axle | VGD95 front axle (drum) |
tire | 315/80R22.5 tires, reinforced front and rear |
cab | HW76 new front cab, main machinery + auxiliary lightweight seats, heating and cooling air conditioning |
bumper | Metal bumper (with front and rear light protection covers) |
intercooler protection | have |
Fuel tank | 400L |
fire extinguisher | have |
top body | 20 cubic sprinkler tank, tank material Q235, 5mm head, 5mm tank body, 80 water pump, front spraying and rear spraying, with working platform and high-pressure water gun, one self-flow port at the rear of the tank, self-flow and self-priming |
Exhaust system | Standard exhaust system |
engine | WP12.400E201 engine |
gearbox | HW19710 gearbox + HW70 flange power take-off |
Frame | Double-layer frame (8+8/300) |
suspension | Reinforced multi-leaf springs front and rear (10/12) |
FAQ:
1.Payment term: 100%T/T (L/C need to negotiate)
100%T/T, 30% deposit for production, pay the balance 70% before the shipment.
2. Warranty : 12 months
1) Main beam for 2 years
2) Axle and other conditions for 1 year
3) No warranty for consumable parts, but we will send you free consumable parts, on-board tools, wires, lamps, etc. before the shipment.
4) Free consultation service for life.
5) Technical repair and guidance questions, engineers can come to service
3.Delivery time: 45 working days
Check if the product is in stock or sufficient raw materials
Normal quantity order delivery time is 15 working days
4.Services
24 hours online for consult
5. LOGO & Color:
factory recommend or as your request.
6.Quality control:
Welcome consult Tina get recent best offer !