| Product Specification | Remark | |||
| Description | Solar Warning Light | 2 types battery (lithium / lead-acid battery) | ||
| Model Number | JY-BSDXXXXL/Q-XX (JY-BSD1404L/Q-RB) | |||
| Power | Material | mono-crystalline silicon solar cell | ||
| Battery | Lithium battery / lead-acid battery | |||
| LED | Quantity | 12/20/30 pcs / module | ||
| Color | red / blue / white | |||
| Emitting Mode | 1/2/3/4 side or customized | |||
| Frequency | 60 times flash / min or customized | |||
| Visible Distance | >1000 m | |||
| Working Time | 100h after fully charged (flash) | |||
| Base Tube Diameter | 80 / 100mm | |||
| Light Intensity | 8000~10000 mcd | |||
| Main Material | Aluminum / Anti-UV PC | |||
| Lifespan | 3 Year | |||
| Working Temperature | -20-60 ºC | |||
| Ingress Protection | IP65 | |||
| Packing | 2 pc/carton | |||
Production & Testing 


Movever Industrial located in Shenzhen, China, which is specializing in roadway safety products & luminous lighting product design service and manufacturing.
We keep learning forever, moving forever, Let's serve for you to be a comprehensive traffic safety, LED lighting solution provider.
we have below products range:
- Professional R & D team,
- High efficiency management system,
- More than 9 years solid manufacturing experiences,
- Experienced process standard to different countries (North America, Europe, Australia, Africa,etc.)
- EXW, FOB, CFR, CIF is optional for your choice.
- Telegraphic Transfer (T/T), Letter of Credit, WU, PayPal are accepted.
Quality control
Question A: How do you control product quality?
>Answer: We have IQC did random inspection and test when raw material was coming,
IPQC did inspection and test of electronic performance for each production line,
FQC did 100% full inspection for appearance & function before packing,
OQC did random inspection as per latest AQL standard.
Question B: What is your minimum order quantity and production lead time?
>Answer: For all modes, we provide sample or sample order, take 3~5 days,
for mass order, average lead time is 7~10 working days.
for glass road block mass order, average lead time is 25~30 working days.
Question C: How to control the delivery products are we need?
>Answer: We will take picture for appearance & package and video for functions test for your approval before delivery.
Question D: What is your after-sale services?
>Answer: We will replace it free in guarantee period.























