Casting Product
Auto Fasteners
Steel
Rear Muffler
Customize
Auto Parts
Investment Casting
Yes
Yes
Customized
Pallet, Manmade Wooden Case or as Your Requiremen
CE, ROHS, SGS
Guangdong, China
8302410000
Product Description
Surface: Satin/Mirror/PVD/Plating
OEM/ODM: Available
Delivery Port: Guangzhou
Delivery Time: 30 to 50 days
Delivery Term: EXW,FOB,CIF,CFR
Investment Casting Parts
Material: Stainless steel, Carbon SteelProcess: Lost wax casting
Standard: GBT6414-1999
Casting Tolerance: CT6 Standard
Weight: 0.1kg to 100kg
Product Range: Automotive, aviation, robot automation, machinery, tools, hardware, electronics, sanitary ware, pump valves, door locks and other stainless steel, carbon steel, alloy steel parts
Tooling made by ourself - We have 2 CNC centers
Complete machining process - We have our own machining, welding, polishing, testing workshops
Material Components | ||||||
Chemical Composition of Material | Material Composition | 201 | 202 | 304 | 316 | 430 |
C | ≤0.15 | ≤0.15 | ≤0.08 | ≤0.035 | ≤0.12 | |
Si | ≤1.00 | ≤1.00 | ≤1.00 | ≤1.00 | ≤1.00 | |
Mn | 5.5-7.5 | 7.5-10 | ≤2.00 | ≤2.00 | ≤1.00 | |
P | ≤0.06 | ≤0.06 | ≤0.045 | ≤0.045 | ≤0.040 | |
S | ≤0.03 | ≤0.03 | ≤0.030 | ≤0.030 | ≤0.030 | |
Cr | 13-15 | 14-17 | 18-20 | 16-18 | 16-18 | |
Ni | 0.7-1.1 | 3.5-4.5 | 8-10 | 10-12 | ||
Mo | 2.0-3.0 | |||||
Mechanical Property | Material Item | 201 | 202 | 304 | 316 | |
Tensile Strength | ≥535 | ≥520 | ≥520 | ≥520 | ||
Yield Strength | ≥245 | ≥205 | ≥205 | ≥205 | ||
Extension | ≥30% | ≥30% | ≥35% | ≥35% | ||
Hardness (HV) | <105 | <100 | <90 | <90 |
1, With our own stainless steel investment casting production lines and machining lines, give you one-stop services.
2, With CNC(CNC CENTER), we make the tooling by ourselves. Make you easier.
3, With 50000 square meters workshop located in Zhaoqing city, near Guangzhou port, transportation is convenient.
4, Use Germany Spectrometer and Salty Spray to test the raw material.
5, We have 30 engineers with strong ability to design and develop new products.
6, With ISO 9001:2015, ISO 14001 and OHSAS 18001 system.
7, With the ERP system, We can give you the production and delivery of information for the first time. Also if any quality problem, we can source it and give you the solution very fast.
8, Fast reply within 12 hours.
Steps | Time | |
Tooling Making | CNC Center | 7 days |
Casting Process | Wax Injection | 2 days |
Sand Shell Molding | 5 days | |
Dewaxing | 1 days | |
Pouring | 1 days | |
Cutting | 1 days | |
Grinding | 1 days | |
Cleaning | 1 days | |
Machining Process | CNC | 2 days |
Drilling & Tapping | 2 days | |
Welding | 2 days | |
Stamping | 1 days | |
Polishing | 5 days | |
Assembling | Ultrasonic Washing | 1 days |
Water Testing | 1 days | |
Assembling | 2 days | |
Remark: The production time base on standard quantity and process |
1.Where is your factory?
Our factory located in Zhaoqing City, Guangdong Province. Factory 50000 square meters with 265 workers.2. What is your payment term?
3. What is the production time?
Balustrade and handrail accessories need 25 to 35 days.
Faucet and shower need 40 to 60 days.
4. Is that possible to visit the factory?
1.Reply you fast within 12 hours.
2.Have someone to follow up all your inquiry and order.
3.We will offer satisfied quality and prices to you.