Hot Search: 195/70r15c  crane  TBR  tractor  250cc motorcycle  truck tire  atv quad  atv tire  car lift  cargo trailer 

Factory Supply E Type Rail Clamps for Railroad Accessories in Large Quantity

Supplier Weifang Shengao Machinery Co., Ltd.
Price $5.00 / Pieces
Availability In Stock
Mini Order:
+-
Subtotal: $50

Purchase details

Payments:

Tax:

Tax Included 

Returns&Refunds:

Eligible for refunds within 30 days of receiving products. returns and refunds 

 
SA-GDJJ
Contact Us
Contact Us
Customized
ISO14001, ISO9001
Metal
Forging
Pressure Casting
Hardware
Iron
Tempering
Sand Blasting
+/-0.2mm
ASME
CE, RoHS, ISO 9001:2008
Shengao, OEM
Steel
Forging
Over 15 Years'experience
SGS, CE, ISO 9001:2015
15 Days After Receiving The Payment
OEM and ODM
Global
Composite Wood Box
DIN/JIS/BS/CE/ASTM
Yes
Customized
10-1000PCS
Yes
Carton Box/Plastic Bag
ShengAo
Plywood Box
SGS
Weifang, Shangdong, China
87089910
Product Description

                Factory Supply E Type Rail Clamps for Railroad Accessories in Large Quantity
 

Product Description


The rail elastic clips (also called rail clip, elastic rail clip )are used with railway sleeper to fasten rails on both sides. The rail clips are usually made of forged spring steel, which are manufactured by hot forging process. The forged rail clips are considered to be better than other metal forming process due to most uniform microstructure.
For meeting various needs of clients, We supplies E-clips, PR clip, SKL clips, Russia rail clip, Deenik clip, Nabla spring blade, KPO rail calmp, gantrex rail clips, fast clip, crane rail clip and other special clips for rails. We have proffesional production cline to design and manufacture standard rail clips or nonstandard clips. welcome to as

   

Name
Railway Fastener
Type
E clip (e1809, e2006,e2007,e2009,etc)
Skl clip (skl1,skl3,skl12,skl14)
Or the type by customers' drawings
Material
60Si2Mn
60Si2Cr
55Si2Mn
38Si7
Chemical composition(%)
C:0.56-0.64, Mn:0.60-0.90, Si:1.60-2.00, Cr:≤0.35, P:≤0.03, S:≤0.03
C:0.56-0.64,
Mn:0.40-0.70, Si:1.40-1.80,
Cr:0.70-1.00,
P:≤0.03, S:≤0.03
C:0.52-0.60, 
Mn:0.60-0.90,
 Si:1.50-2.00,
Cr:≤0.35 ,
P:≤0.03, S:≤0.03
C:0.35-0.42, Mn:0.50-0.80, Si:1.50-1.80, P:≤0.03,
S:≤0.03
Hardness
For e clip: 44-48HRC
For skl clip: 42-47HRC
Fatigue life
for Dia.18 is 3 millions cycles without breaking
Surface
plain (oiled), Oxide black, color painting, HDG, Zinc Plating...
Standard refers
DIN17221, BS970, GB/T1222


Production Processes of Elastic Rail Clips:

  1. Raw material purchasing
  2. Shearing
  3. Heating to forging temperature
  4. Forming
  5. Hardening
  6. Tempering
  7. Surface treatment
  8. Inspection-Packing




To produce rail clips usually use spring steel bar as the raw materials, before heating, raw materials must be sheared according to the length required. Then they are heated to 950ºC to 1000ºC, next works transfer the heated bar to power press for forging, in accordance with drawing three sets of dies and fixtures are kept before hammering. The following procedure is to convey the forged rail clips to quenching tank. Then check the dimensional accuracy and quench hardness of the rail clips. The next procedure is tempering to achieve appropriate toughness in the spring. And the final step is to pack the rail clips after serious inspection.


       
                Our Services
                  1. Long standing reputation in this field.
                  2. Specialization is standard and accurate meet your requirement.
                  3. OEM quality standard guaranteed.
                  4. Product upgrading and expansion of species.
                  5. Good quality with competitive prices.
                  6. Flexible and convenient logistic service.
                  7. Excellent and high quality control.
                  8. Long lasting working life time.
                  9. Sufficient storage.
                 10. Original truck spare parts and professional manufacture.
                 11. High technology and stable performance.
                 12. Various size and models available.

     Process Quality Control

    1,Make proper designing of mould precisely to ensure dimensions of product qualified.

    2,Strictly control the production temperature to ensure well-distributed temperature.

    3,Inspect dimensions of product and surface quality at regular .

    FAQ:
    1. Are you a genuine manufacturer?

    Yes, all products shown on our website are produced in our ISO9001:2015 certified factory; We are also a company registered by China Customs with the right to export and import. 

    2. What should I offer to get your quotation?
    Please offer us your detailed information for the product, such as drawings with 2D/3D by software Pro/E, Auto CAD, SolidWorks, UG etc; as well as materials, surface treatment, quantity, and package. Any special requirements should be highlighted especially for tolerance. 

    3. How long does it take to receive samples?
    20 working days, the lead time is the general production period and does not include transportation time.
    we can supply free samples with less quantity, but customers need to pay shipping costs.

    4. How long is the manufacturing lead time?
    Mass Production:30-45 working days after sample approval by yours.T
    he lead time is the general production period without the transportation time.

    We could make some special production arrangements effectively if the customer has an urgent need.

    5. How long does it take to ship goods from China by sea?
    It takes about 5 weeks to European ports plus 1 week for customs clearance, so you can get the container within 6 to 7 weeks.
    It takes about 2 weeks to the east coast and 3 weeks to the west coast US ports. All sea goods are shipped from Qingdao/Shanghai/Ningbo Port.


    6. How long does it take to ship goods from China by air?
    It takes about 7 days to all major destinations.

    7. New product development process
    Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept. To ensure the developing schedule---Design mold, fixture, and gauge and make them in our factory--- mold. fixture and gauge making---producing samples---approved from customer-purchasing material-forging-heat treatment-shot blasting-machining-Inspection-package---delivery

    8. Can we visit the factory to conduct an audit?
    Yes, you are welcome to visit our factory.



     Quality First, Price Best, Service Foremost!
     We assure you of our best services at all times!

    Send Message
    Message Type
    *Content
    *Your Name  
    *Tel
    *Email
    * Captcha  
    You May Like
    $8.00
    $8.00
    $0.10
    $3.00
    $5.00
    $6.88
    $2.50
    $1.00
    $690.00
    $2.60
    $600.00
    $900.00
    $20000.00
    $5.00
    Related Search: Vehicles Train & Railway Railway Supplies
    Home  |  About Us  |  Contact Us  |  Terms of Use  |  Privacy Policy  |  Billing Terms  |  Shipping Policy  |  Return & Refund Policy  |  Sitemap  |  Feedback  |