E191
Waving Escalator
9000 Persons/H
Indoor Type
0.5M/S
30°
1000mm
Two
AC Elevator
Glass Balustrade or Stainless Steel Balustrade
Linear
Indoor Escalator
Shopping Mall, Supermarket
a+++
White, Blue
Square Pipe
En 1090-1:2009+A1:2011
Stainless Steel, Aluminum
IP21
IP65
Single Speed up &Down Reversible
SYNEY or OEM
1 Set One 40hq Container
GB16899-2011
Zhejiang, China
842840000
Product Description
Product description
Syney New Design Best Quality Waving Escalator for Shopping Complex
Model: E191
Safe, pretty and efficient, the distinctive Syney escalator displays construction class and style, making customers better enjoy their shopping.
Escalator safety measures
Functions
Certificates
CE Certificate of escalator and moving walk/ passenger conveyor
CE Certificate of energy-efficiency of lifts: A+++
EAC Certificate of escalator and moving walk/ passenger conveyor
Company Profile
No rejected raw material will be accpeted!
When raw material comes to factory, QC department will check all the materials, once any fault items found, it will be returned to suppliers at once. Only qualified material will get into raw material warehouse.
Production management
Every week, production department will make the production plan and update the schedule of online products. There is daigital board in each workshop showing the production plan everyday. In this way, from workers to managers all clearly know which project is online now.
Every moring, managers will guide the workers to run for 15 minutes first to refresh. Then check the machines status before operation and check again after one day job.
Packing
All parts are packed in solid plywood boxes, which can stand long time sea shipping and fumigation free. For some important parts like control cabinet, door operator and motor, parts will be covered by a strong film first, with desiccant, before put into boxes.
Quality control
1) All raw materials will be checked before get into warehouse. And bulk electronic product do sampling inspection. All parts must have qualified certificate from suppliers. QC1 is responsible for this.
2) During production stage, QC2 will check commissioning for each elevator, escalator and moving walks.
3) After elevator and escalator finished, QC3 will test the match of elevator motor and control cabinet, and the running condition of escalator and moving walks.
4) After packed, QC4 will check package condition for each parts, and takes photo for further reference.
5) When delivery, QC5 will check if all parts packed in container to avoid any missing, and takes photo for further reference.
Projects
Syney New Design Best Quality Waving Escalator for Shopping Complex
Model: E191
Safe, pretty and efficient, the distinctive Syney escalator displays construction class and style, making customers better enjoy their shopping.
Escalator | Indoor and Outdoor |
Travel Height | H≤30000mm |
Step Width | 600mm, 800mm, 1000mm |
Inclined Degree | 35°, 30° |
Speed | 0.5m/s, 0.65m/s |
Escalator Width | 1260mm, 1460mm, 1660mm |
Noise | ≤65dB |
Vibration | ≤35cm/s² |
Flat step | 2 flat step, 3 flat step, 4 flat step |
Running | Single speed up &down reversible |
Delivery | 40ft high container |
Power Supply | Power 380V , 50Hz Three Phase Five Wire System Lighting 220V, single phase |
Energy Saving Function | VVVF, Auto start stop |
Escalator safety measures
Functions
Standard safety functions | |||||
1 | Emergency Stop Button | Yes | 19 | Machine Room Protect Board | Yes |
2 | Handrail Entry Contact | Yes | 20 | Step Light | Yes |
3 | Broken Step Chain Protection | Yes | 21 | Skirt Panel Contact | Yes |
4 | Comb Plate Contact | Yes | 22 | Step Yellow Safety Line | Yes |
5 | Inspection Socket | Yes | 23 | Alarm Bell When Start | Yes |
6 | Phase Failure and Phase Stagger Protection | Yes | 24 | Floor Plate Open Device | Yes |
7 | Step Sag Contact | Yes | 25 | Alarm Signs | Yes |
8 | Stop Button | Yes | 26 | Main Driving Chain Broken Protect Device | Yes |
9 | Main Power Switch | Yes | 27 | Overspeed Lowspeed Protection | Yes |
10 | Circuit Grounding Device | Yes | 28 | Step Static-free Device | Yes |
11 | Non-operational Reversal Safety Device | Yes | 29 | Handrail Belt Speed Detect Protection | Yes |
12 | Overload Protect | Yes | 30 | Floor Plate Open Detect Device | Yes |
13 | Portable Lamp and Socket | Yes | 31 | Step Missing Detect Protection | Yes |
14 | Handrail Belt Antistatic Device | Yes | 32 | Working Brake Open Detect Device | Yes |
15 | Traction Flywheel Cover Open Detect Switch | Yes | 33 | Skirt Panel Anti Clamp Device | Yes |
16 | Maintenance Power Supply Socket | Yes | 34 | Working Brake | Yes |
17 | Step Anti Bounce Device | Yes | 35 | Auto Lubricating Device | Yes |
18 | Safety Signs | Yes | |||
Optional functions | |||||
1 | Blocking device | ○ | 8 | Handrail lightening | ○ |
2 | Anti-climb device | ○ | 9 | Direction indicator | ○ |
3 | Anti-climb device is Not preset. | Yes/No | 10 | Oil-water separator | ○ |
4 | Vertical protect board | ○ | 11 | Liquid level switch | ○ |
5 | Handrail disconnect protect device | ○ | 12 | Heating device | ○ |
6 | Brake shoe wearing detection | ○ | 13 | Cladding | ○ |
7 | Auxiliary brake | ○ |
Certificates
CE Certificate of escalator and moving walk/ passenger conveyor
CE Certificate of energy-efficiency of lifts: A+++
EAC Certificate of escalator and moving walk/ passenger conveyor
Company Profile
SYNEY is the leading elevator & escalator manufacturer in China. Our main products include passenger elevator, freight elevator, goods lift, panoramic elevator, observation lift, hospital bed elevator, villa home lift, escalator, waving escalator and moving walk.etc.
Depending on advanced technologies, modern equipments, standardized management, and perfect marketing customer service network, the business of Syney Elevator has been improving steadily, not only covers the whole country, but also has been sold to Russia, Middle East, Southeast Asia, Korea and America, etc, becoming one of elevator enterprises with the highest potential.
The enterprise has two manufacturing factories. The registered capital is USD 35 million, covering nearly 99000 square meters, with over 80 engineering technicians and nearly 30 senior managers.
From the raw material getting into factory to finished products getting out to customers, Syney has a strict operation system to control each steps.Depending on advanced technologies, modern equipments, standardized management, and perfect marketing customer service network, the business of Syney Elevator has been improving steadily, not only covers the whole country, but also has been sold to Russia, Middle East, Southeast Asia, Korea and America, etc, becoming one of elevator enterprises with the highest potential.
The enterprise has two manufacturing factories. The registered capital is USD 35 million, covering nearly 99000 square meters, with over 80 engineering technicians and nearly 30 senior managers.
No rejected raw material will be accpeted!
When raw material comes to factory, QC department will check all the materials, once any fault items found, it will be returned to suppliers at once. Only qualified material will get into raw material warehouse.
Production management
Every week, production department will make the production plan and update the schedule of online products. There is daigital board in each workshop showing the production plan everyday. In this way, from workers to managers all clearly know which project is online now.
Every moring, managers will guide the workers to run for 15 minutes first to refresh. Then check the machines status before operation and check again after one day job.
Packing
All parts are packed in solid plywood boxes, which can stand long time sea shipping and fumigation free. For some important parts like control cabinet, door operator and motor, parts will be covered by a strong film first, with desiccant, before put into boxes.
Quality control
1) All raw materials will be checked before get into warehouse. And bulk electronic product do sampling inspection. All parts must have qualified certificate from suppliers. QC1 is responsible for this.
2) During production stage, QC2 will check commissioning for each elevator, escalator and moving walks.
3) After elevator and escalator finished, QC3 will test the match of elevator motor and control cabinet, and the running condition of escalator and moving walks.
4) After packed, QC4 will check package condition for each parts, and takes photo for further reference.
5) When delivery, QC5 will check if all parts packed in container to avoid any missing, and takes photo for further reference.
Projects