Model NO.
ACE-420
Drive Mode
4*4
Maximum Horsepower
2200rpm
Condition
New
Gross
12675kg
Net
9000 Kg
Brake
Air Brake
Wheelbase
2250mm
Tilt Angle
30%
Max Drum Capacity
6.5m3
Transport Package
PE
Specification
7500x2700x3380mm
Trademark
ACE
Origin
Ningbo
HS Code
8705400000
Production Capacity
5000PC/Year
Certification:
ISO9000, CE
Transmission Type:
Automatic
Emission Standard:
State four
Displacement:
3
Payload:
8.3t
Fuel:
Diesel
4.2cubic Self Loading Concrete Mixer Truck Factory
Mobile concrete mixer feature combines self-loading,weighting,mixing and discharging,it can maximize and improve the job efficiency and reduce the production cost and time.
Features&Advantages: |
Mobile concrete mixer feature combines self-loading,weighting,mixing and discharging,it can maximize and improve the job efficiency and reduce the production cost and time.
-High efficiency
-Capacity:15-16cubic meters per hour
100cubic meters/day
3000cubic meters /year
-Labor-saving
100cubic meters/day
3000cubic meters /year
-Labor-saving
-4 WD
-The mixing unit is hydraulic slewing 270 degree for high discharge over 1.8m to the four sides of the vehicle.
-The mixing unit is hydraulic slewing 270 degree for high discharge over 1.8m to the four sides of the vehicle.
Specification: |
Name | Item | Specification | |||
Net | 9000 KG | ||||
Gross | 12675KG | ||||
Transmission | Full Hydraulic 4 WD | ||||
Brake | Air Brake | ||||
Chassis | Off-road | ||||
Tread | 1880 | ||||
Wheelbase | 2250mm | ||||
Loader bucket | capacity | 0.6m3 | |||
Control | Hydraulic | ||||
Tilt angle | 30% | ||||
Speed | High | 0-25KM/H | |||
Low | 0-9KM/H | ||||
MAX drum capacity | 6.5M3 | ||||
Tyre model | 16/70-20 wire tyres | ||||
Engine | Type | YUCHAI | 4108 Turbo charged | ||
Cummisn | 4BT3.9-C125 | ||||
Rated Power/RPM | 95KW/2200RPM Or 125HP /2200RPM | ||||
Max.Torque/RPM | 460N.M/1400RPM | ||||
Cylinder | 4 | ||||
Starter | Electric | ||||
Cooling type | water cooling | ||||
Maxing Drum | Output capacity | 4.2 M3 | |||
Bank Angle | 16 ° | ||||
Rotation Angle | 19-21R/min | ||||
Chute | Swing Angle | ≥60° | |||
Angle control | Hydraulic | ||||
Size | Long:176cm | ||||
Short:40cm | |||||
Weighing model | computer control | ||||
Concrete Standard | C15.C20.C25 C30 | ||||
Accuracy | Cement | ≤±2%/time | |||
Relative Error | ≤±3%/time | ||||
water | ≤±1%/time | ||||
Additive | ≤±1%/time | ||||
Admixture | ≤±2%/time | ||||
Loader control | Hydraulic 4 way stick |
Ultimate tank capacity technology can discharge with different angles by chute |
- The clever discharge cone is designed,to provide stronger material sealing capacity and higher filling rate,thus improving the loading capacity of the tank up to 6%.
- Loading capacity is larger for the same volume.
- The center of gravity is low for the same loading capacity.
- Swing tank easy discharge to different way.
High-strength wear-resistant application | Four-dimensional mixing technology |
| · Loading shovel:effective capacity per loading complete with hydraulic opening gate with bigger blade. |
Efficient hydraulic drive system | Four-dimensional mixing technology |
|
|
Factory: |
Hot Products |
Excavator | Surface Finishing Screed | Concrete Vibrator | Power Trowel |
Remote Control Trowel | Concrete Mixer | Plate Compactor | Compactor Machine |
Drywall Sander | Steel Bar Cutter | Vibratory Roller | Steel Bar Bender |
FAQ |
1. Do you guarantee safe and secure delivery of products? Yes, we always use high quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature sensitive items. Specialist packaging and non-standard packing requirements may incur an additional charge. |
2. Can you supply the relevant documentation? Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required. |
3. What is the average lead time? For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when we have received your deposit, and we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so. |
Send Message