The modern coffee trike is uses a new design concept ,it is not only used to sell coffee,also coffee trikes for vending, marketing, and product distribution. You can sell hot dogs, BBQ, ice cream and so on.
It has several advantages:
1. It can be added to the cooling function according to your needs.
2. Greater use of the area to meet a variety of needs.
3. More advertising area to show your brand.
Motor | 250w rear hub motor | Gear | 7 speeds |
Battery For bike | 36V/10ah Lithium battery | Brake / Front | Mechanical disc brake |
Battery For water pump: | 12V/20ah acid battery | Brake / Rear | Mechanical disc brake |
Driveline | KMC Chain | Wheel / Front | 20*2.125'' Aluminum rim |
Gradeability | 25° | Wheel / Rear | 24*2.25-19 Aluminum rim |
Box L*W*H(mm) | 1200 * 980 * 670 | G.W./N.W. (kg) | 310Kg/190Kg |
Trike L*W*H(mm) | 2360* 980* 670 | Container Q'ty | 8pcs/20GP,16pcs/40GP |
Packing L*W*H(mm) | 2450*1120*1360 | Assembly | 80% |
Max Loading | 280Kg | Material | Steel frame & wooden box |
1. LCL : bikes are packed with thick air bubble film and foam,then put into boxes which are made of steel frame and thick wooden panel.
2. FCL : bikes are wrapped with thick air bubble film,and then packed into thick carton box before finally loaded into container.
1. OEM Manufacturing welcome: Product, Package...
2. Sample order .
3. We will reply you for your inquiry in 24 hours.
4. After sending, we will track the products for you once every two days, until you get the products. When you got the
goods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offer
the solve way for you.
Factory + trade (mainly factories, so the quality can be ensured and price competitive)
2)How long have your company run on tricycle?
10 years focusing on tricycle,10 years exporting experience.
3)Which payment terms are you accept?
Payment Terms: T/T, Western Union, or cash
4)After an order is placed, when to deliver?
it will be decided by the time of the factory production and your quantity.Normally around 15 days.
5)If the products are not conformity with requirements, how to solve?
If the products are not conform to customer samples or have quality problems, our company will be responsible for it.
6)What about the cooperation process?
Confirm details of order, 50% deposit, Arrange production, pay the balance, shipment.