Hot Search: atv  car  TBR  jetour  utv  stainless  250cc motorcycle  truck tire  atv quad  atv tire 

49e1, 49e2, 50e1, 50e2, 50e4, 50e5, 50e6, 54e1, 54e2, 54e3, 55e1, 60e1 Rail Cr73, Cr100, 50n Rail, Elastic Rail Clips, Rail Road Ties

Supplier Shanghai Bosheng Industries Co., Ltd.
Price $800.00 / Ton
Availability In Stock
Mini Order:
+-
Subtotal: $800

Purchase details

Payments:

Tax:

Tax Included 

Returns&Refunds:

Eligible for refunds within 30 days of receiving products. returns and refunds 

 
Model NO.
49E1, 49E2, 50E1, 50E2, 50E4, 50E5, 50E6, 54E1, 54
Origin
China
HS Code
73021000
Production Capacity
5000ton/Year
Warranty:
5years
Customized:
Customized
Certification:
ISO9001
Type:
Rail
Transport Package:
Bulk
Trademark:
BS
 
49e1, 49e2, 50e1, 50e2, 50e4, 50e5, 50e6, 54e1, 54e2, 54e3, 55e1, 60e1 Rail Cr73, Cr100, 50n Rail
49e1, 49e2, 50e1, 50e2, 50e4, 50e5, 50e6, 54e1, 54e2, 54e3, 55e1, 60e1 Rail Cr73, Cr100, 50n Rail
49e1, 49e2, 50e1, 50e2, 50e4, 50e5, 50e6, 54e1, 54e2, 54e3, 55e1, 60e1 Rail Cr73, Cr100, 50n Rail
49e1, 49e2, 50e1, 50e2, 50e4, 50e5, 50e6, 54e1, 54e2, 54e3, 55e1, 60e1 Rail Cr73, Cr100, 50n Rail
49e1, 49e2, 50e1, 50e2, 50e4, 50e5, 50e6, 54e1, 54e2, 54e3, 55e1, 60e1 Rail Cr73, Cr100, 50n Rail
49e1, 49e2, 50e1, 50e2, 50e4, 50e5, 50e6, 54e1, 54e2, 54e3, 55e1, 60e1 Rail Cr73, Cr100, 50n Rail
49e1, 49e2, 50e1, 50e2, 50e4, 50e5, 50e6, 54e1, 54e2, 54e3, 55e1, 60e1 Rail Cr73, Cr100, 50n Rail
49e1, 49e2, 50e1, 50e2, 50e4, 50e5, 50e6, 54e1, 54e2, 54e3, 55e1, 60e1 Rail Cr73, Cr100, 50n Rail
49e1, 49e2, 50e1, 50e2, 50e4, 50e5, 50e6, 54e1, 54e2, 54e3, 55e1, 60e1 Rail Cr73, Cr100, 50n Rail
49e1, 49e2, 50e1, 50e2, 50e4, 50e5, 50e6, 54e1, 54e2, 54e3, 55e1, 60e1 Rail Cr73, Cr100, 50n Rail
49e1, 49e2, 50e1, 50e2, 50e4, 50e5, 50e6, 54e1, 54e2, 54e3, 55e1, 60e1 Rail Cr73, Cr100, 50n Rail
49e1, 49e2, 50e1, 50e2, 50e4, 50e5, 50e6, 54e1, 54e2, 54e3, 55e1, 60e1 Rail Cr73, Cr100, 50n Rail
 
 49E1, 49E2, 50E1, 50E2, 50E4, 50E5, 50E6, 54E1, 54E2, 54E3, 55E1, 60E1 Rail CR73, CR100, 50N Rail
 is the main component of railway track. Its role is to guide the wheel of the rolling stock forward, withstand the huge pressure of the wheel, and transferred to the sleeper.
   49E1, 49E2, 50E1, 50E2, 50E4, 50E5, 50E6, 54E1, 54E2, 54E3, 55E1, 60E1 Rail CR73, CR100, 50N Rail is mainly used as transportation railway rail for heavy vehicle, and it can be also used in underground mining and crane industry. 49E1, 49E2, 50E1, 50E2, 50E4, 50E5, 50E6, 54E1, 54E2, 54E3, 55E1, 60E1 Rail CR73, CR100, 50N Rail is widely used in the railway track system. Together with the cooperation with the railroad switch, 49E1, 49E2, 50E1, 50E2, 50E4, 50E5, 50E6, 54E1, 54E2, 54E3, 55E1, 60E1 Rail CR73, CR100, 50N Rail can make trains running without turning to the other directions. In general,49E1, 49E2, 50E1, 50E2, 50E4, 50E5, 50E6, 54E1, 54E2, 54E3, 55E1, 60E1 Rail CR73, CR100, 50N Rail is consist of two parallel steel tracks and lays steadily on the railway sleepers. With the development of railway industry, the steel is widely used in the industry. Compared with other materials, the steel have a larger tolerance to bear more weight. 49E1, 49E2, 50E1, 50E2, 50E4, 50E5, 50E6, 54E1, 54E2, 54E3, 55E1, 60E1 Rail CR73, CR100, 50N Rail can disperse the weight of the steel tracks and keep the stability of the railway transportation. The stones under the steel tracks can supply a elasticity to the railroad tracks. During the common life, the steel tracks can lay on the base made of concrete and even can be embedded into concrete. Steel rail also can called railway track, steel railway track, etc. Steel rail is a metal groove or ridge that holds, guides, and reduces friction for a moving device or apparatus. It's paved with strip steel route for driving the train, trolley, etc.The standard steel rail usually composed by two joint bars, rails fixed to the sleepers, rail pad under the sleepers for the road, including roadbed, rail connection parts, etc.
  49E1, 49E2, 50E1, 50E2, 50E4, 50E5, 50E6, 54E1, 54E2, 54E3, 55E1, 60E1 Rail CR73, CR100, 50N Rail can provide a continuous, smooth, and least resistance rolling surface for wheels. In electrified railway or automatic block sections, 49E1, 49E2, 50E1, 50E2, 50E4, 50E5, 50E6, 54E1, 54E2, 54E3, 55E1, 60E1 Rail CR73, CR100, 50N Rail can also be used as track circuits.49E1, 49E2, 50E1, 50E2, 50E4, 50E5, 50E6, 54E1, 54E2, 54E3, 55E1, 60E1 Rail CR73, CR100, 50N Rail can be used as cheap rails for a disposable line, for example, if you need to move equipment in a factory, but the equipment is too heavy to be properly transported by car, you can use 49E1, 49E2, 50E1, 50E2, 50E4, 50E5, 50E6, 54E1, 54E2, 54E3, 55E1, 60E1 Rail CR73, CR100, 50N Rail to build a temporary line.
   Shanghai Bosheng Industries Co., Ltd pays great attention to quality control and management. Our 49E1, 49E2, 50E1, 50E2, 50E4, 50E5, 50E6, 54E1, 54E2, 54E3, 55E1, 60E1 Rail CR73, CR100, 50N Rail is completely controlled by iso9001-2008 quality system, and we have obtained the production license of railway products from The Ministry of Railways of China. We have a full set of testing equipment to ensure that all of our rail products meet customer requirements.
Shanghai Bosheng Industries Co., Ltd is an ISO 9001/2008 certified company. All processes are in accordance with the requirements of ISO quality management system, from supplier quality control to finished products, we are in accordance with the standard procedures, we have strict quality control system for suppliers:
1. Before producing
49E1, 49E2, 50E1, 50E2, 50E4, 50E5, 50E6, 54E1, 54E2, 54E3, 55E1, 60E1 Rail CR73, CR100, 50N Rail, we will check and test the raw materials. we require suppliers to provide production batch number, chemical composition, mechanical properties and other testing indicators.
2. Our quality control inspectors take sample sampling and batch testing after the process of manufacturing
49E1, 49E2, 50E1, 50E2, 50E4, 50E5, 50E6, 54E1, 54E2, 54E3, 55E1, 60E1 Rail CR73, CR100, 50N Rail, and provide raw material certificate and other means to control the testing process.
3.According to the different requirements of
49E1, 49E2, 50E1, 50E2, 50E4, 50E5, 50E6, 54E1, 54E2, 54E3, 55E1, 60E1 Rail CR73, CR100, 50N Rail, we make the corresponding physical and chemical testing and inspection. If the results do not meet our requirements, we will refuse to accept the materials only if they meet our standards.
4. For semi-finished products and their external suppliers of
49E1, 49E2, 50E1, 50E2, 50E4, 50E5, 50E6, 54E1, 54E2, 54E3, 55E1, 60E1 Rail CR73, CR100, 50N Rail, we often organize quality control coordination meetings and provide technical advice and guidance. Ensure that qualified products are delivered to our customers prior to shipment.
Send Message
Message Type
*Content
*Your Name  
*Tel
*Email
* Captcha  
You May Like
Related Search: 49e1 49e2 50e1 50e2 50e4 50e5 50e6 54e1 54e2 54e3 55e1 60e1 Rail Cr73 Cr100 50n Rail Elastic Rail Clips Rail Road Ties Railway Supplies