Hot Search: 6008253261  5761.45  205/70r15  lambo lamborghini  235/70r16  48v500w  235/45r20  3000r/min  155r13c  600/65r25 

50t Eaf & 50t Lf De-Dusting System, De-Dusting System for Steel Plant, 50t Eaf & 50t Lf De-Dusting System

Supplier Ningbo Ville Electric Co., Ltd.
Price $500000.00 / Piece
Availability In Stock
Mini Order:
+-
Subtotal: $500000

Purchase details

Payments:

Tax:

Tax Included 

Returns&Refunds:

Eligible for refunds within 30 days of receiving products. returns and refunds 

 
Model NO.
EAF & LF
Dedusting Mode
Eaf
Transport Package
Nude, Wooden Case
Specification
To be checked
Trademark
Ville
Origin
China
HS Code
85149010
Production Capacity
10units Per Year
Certification:
CE, ISO
Installation Method:
Horizontal
Operation Type:
Automatic
Medium Material:
Furnace
Dust Collecting Method:
Dry
Type:
Eaf
1. Technical parameter
  Dedusting mode: EAF is 4th hole + canopy, LF is 4th hole.
1.1 Long bag type dust collector
SNItemUnitDataRemark
1Type LLP10000 
2Quantityset1 
3Filter bag°C≤120 
4Bag materialWater and oil repellent polyester needle felt
5Filter area 10000 
6Fume speed at filterm/min≤1.2 
7Fume amountm3/h600000 
8Filter bag sizemmφ130×6000 
9Filter bag quantitypcs.4100 
10Pulse vavle quantitypcs.240 
11System resistancePa<1500 
12Dust emission concentrationmg/ Nm3<50 
13Dust cleaning control PLCPulse type, off line
14Dust roomnos.16 
15Dust removal mode  Mechanical conveyor
 
1.2 De-dusting fan & motor
SNItemUnitDataRemark
1Fan model Y4-73No25F (T) 
2Quantiyset1 
3Fan deliverym3/h600000 
4Fan aire pressurePa4200 
5Motor power 1250kW10kV
6Quantiyset1 
7Motor speedrpm960 
8Protection class IP44 
 
2. Supply list & breakdown price
SNItemUnitQtyRemark
AMechanical part   
1Main fume pipelinet150 
2Water cooled pipelinem50For EAF
3Water cooled pipelinem30For LF
4Pneumatic butterfly valveset1 
5Air mixing valveset1 
6EAF fanset1 
7EAF motorset1 
8Noise insulation & reduction partset1 
9Fluid transmission couplierset1 
10Bag type dust collectort330 
11Air tankset15m3
12Freeze dryerset15m3
13Compressed air triplet setset1 
14Pipeline fittingsset1 
15Air source treatment partset1 
16Star dust unloader valveset18DF300
17Screw dust conveyorset2φ30/φ40
BElectrical part   
1H.V. incoming panelpc.1 
2H.V. breaker panelpc.1 
3Liquid resistance starter panelpc.1 
4HMI panelpc.1 
5PLC panelset1Siemens S7-300
6GGD panelpcs.4 
7Field junction boxpc.4 
COthers   
1Package, customs, doucments 1 
2Installation material 1 
3China transportation 1 
 Total Price (FOB china port)  
Supplied by the Buyer:
1) Installation, hydraulic medium, lubrication medium and cleaning medium;
2) Roof canopy (meltshop roof steel structure), pipeline supports, chimney;
3) Civil works and design (Seller provides furnace foundation drawings and civil work requirements),
embedded furnace foundation parts;
4) Water supply and gas supply main inlet are laid to Seller's equipment connection point, 10kV
incoming line to Seller's H.V. panel, L.V. are connect to Seller's L.V. distribution panel.


3. Delivery: 6 month after the Seller receiving down payment.

50t Eaf &amp; 50t Lf De-Dusting System

50t Eaf &amp; 50t Lf De-Dusting System

50t Eaf &amp; 50t Lf De-Dusting System

Sales:
50t Eaf &amp; 50t Lf De-Dusting System

Our Best Service For You
1.Pre sale service
a.make technical solution
b.send quotation, technical data sheet and drawing
c.prepare power transmission plan, testing plan and shipment plan
2.In sale service
a.supervise the manufacturing schedule totally in accordance with the plan
b.send photos to customer during every manufacturing process(hold point)
c.inform the customer one week before testing.
3.After sale service
a.installation and commissioning, training the workers
b.quick response within 12 hours any time
c.provide 12 months guarantee period normally.

FAQ For You
1. Q:What is your delivery time ?
A: Depend on the type of transformer.
2. Q:What is your payment term?
A: 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
3. Q:What kind of standard you follow?
A: IEC, ANSI, GB, etc
4. Q:What kind of supporting documentation you can provide normally
A: Quotation, outline drawing, manufacturing plan, quality control plan
testing plan, financial report, type test report(KEMA, CESI),reference list, etc
5. Q:What is your normal warranty period?
A: 12 months after transformer operation.
6. Q:Can u do installation and commission in user's site?
A: Yes, we can send our installation team to user's country for service.
7. Q:Do you have any experience in this kind of transformer?
A: Yes, we can provide reference list for check.

Our advantages:
Quality Assurance
--From the very beginning, VILLE ensures quality in every step to achieve the best quality.
 Experience Sharing
--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.
 Global Service
--Wherever you are, VILLE global network will support and provide you with value.
 Quick Response
--In response to your needs without delay, VILLE  knows the value of your time.

Thanks for choosing VILLE as your reliable partner and
please trust both of us will create a brilliant future!
Send Message
Message Type
*Content
*Your Name  
*Tel
*Email
* Captcha  
You May Like
Related Search: 50t Eaf & 50t Lf De-Dusting System De-Dusting System for Steel Plant 50t Eaf & 50t Lf De-Dusting System Vehicle Parts & Accessories Vehicle Maintenance Care & Decor Vehicle Repair & Specialty Tools Dust Collector