Model NO.
RMC-201L
Condition
New
Transport Package
Wooden Box
Specification
multi stage
Trademark
yindu
Origin
China
HS Code
84122100
Production Capacity
1000 Sets Per Month
Type:
Hydraulic Jack
Structure:
Hydraulic Jack
Capacity (Load):
11-20T
Power Source:
Hydraulic
Max Height:
87mm
Certification:
CE
Multi steps hydraulic cylinder RMC-201L
Features:
1 Low height is suit for working in nallowness; Short stroke can broke up times and times.
2 The surface of plunger is finished with chrome plate to protect the using of longevity of the product.
3 Plunger has the function of retracting automatically.
Attention:
1. Before using, probably weight of the object should be taken, selecting the jack of proper specifications, overloading to use must be avoided.
2. Before using, the jack should be inspected, and filled with lubricating oil.
3. Before using, origin of forces should be inspected to avoid danger.
4. While using, jack must be placed steady.
5. While jacking up, rising altitude of the sleeve should below the red warn line which shows the Max altitude to avoid danger.
Multi steps Hydraulic Cylinder RMC-201L | |||||
Item No. | RMC-101L | RMC-201L | RMC-301L | RMC-501L | RMC-1001L |
Output(T) | 10 | 20 | 30 | 50 | 100 |
Stoke(mm) | 25 | 26 | 53 | 64 | 75 |
Effective area(cm2) | 11.3 | 19.6 | 33.1 | 56.7 | 95 |
Oil Capacity(L) | 0.022 | 0.041 | 0.058 | 0.113 | 0.225 |
Height of products(mm) | 47 | 52 | 63 | 69 | 86 |
Extended height(mm) | 74 | 80 | 118 | 135 | 163 |
Outside(mm) | 81X56 | 100X77 | 115X95 | 138X115 | 185X160 |
Bore die(mm) | 43 | 60 | 75 | 95 | 130 |
Principal Dia(mm) | 38 | 53 | 63 | 85 | 110 |
Weight(kg) | 1.5 | 2.4 | 4.5 | 7 | 15 |
1 Low height is suit for working in nallowness; Short stroke can broke up times and times.
2 The surface of plunger is finished with chrome plate to protect the using of longevity of the product.
3 Plunger has the function of retracting automatically.
Attention:
1. Before using, probably weight of the object should be taken, selecting the jack of proper specifications, overloading to use must be avoided.
2. Before using, the jack should be inspected, and filled with lubricating oil.
3. Before using, origin of forces should be inspected to avoid danger.
4. While using, jack must be placed steady.
5. While jacking up, rising altitude of the sleeve should below the red warn line which shows the Max altitude to avoid danger.
Send Message