Model NO.
VPB-SD98
Coating
Powder Coating
Airflow Direction
Downdraft
Heating Mode
Diesel
Paint Mist Treatment
Dry-type
Condition
New
Outer Dimension:(mm)
7000*5350*3400mm
Inner Dimension:(mm)
6900*3900*2650mm
Fresh Air Flow
30000m3/H
Exhaust Air Flow
30000m3/H
Ceiling Lighting
8 Units, Each 4 * 16.5W LED Lamps.
Side Lighting
8 Units, Each 2 * 16.5W LED Lamps.
Heating System
Riello G20 Burner
Total Power
17kw
Electric
3pH, 220V/380V/415V, 50Hz/60Hz
Main Door
Grey/Red/Blue/Green/Orange
Transport Package
20gp/Set
Origin
China
After-sales Service:
5 Years
Warranty:
2 Years
Type:
Spray Booth
Certification:
CE
Substrate:
Steel
Brand:
Vico





Luxurious Diesel Type,Spray and Painting Booth#VPB-SD9
| Outside Dimension (mm) | 7000×5350×3400 | Inside Dimension(mm) | 6900×3900×2650 |
| Front Door(mm) | 3000×2600(W*H) | Service door(mm) | 800×2000(W*H) |
| Total Power | 17kw | ||
| Cabin system | Front door | Sheet metal door, double side with PU insulated | |
| Wall panel | 50mm rockwool sandwich panel, steel sheet thickness: 0.426mm | ||
| Ceiling panel | 0.8mm galvanized steel sheet | ||
| Basement | 300mm depth construction galvanized basement, full galvanized grids | ||
| Ramps | Two pieces 2000*750mm ramps | ||
| Door glass | 5mm tempered glass | ||
| Air make-up system | Air inlet fan system | 1 set 7.5kw turbo fan, fan model:DDF-630B, with one manual damper | |
| Exhausted fan system | 1 set 7.5kw turbo fan, fan model: DDF-630B, with one manual damper | ||
| Air inlet capacity | 30000m3/h | ||
| Exhausted capacity | 30000m3/h | ||
| Exhausted ducting | six meters straight galvanized ducting and two 135 degrees elbows | ||
| Purification system | Pre-filter | G3 grade | |
| Ceiling filter | 600G filter EU5 / F5 | ||
| Floor filter | Fiber glass filter | ||
| Exhausted filter | Fiber glass and carbon filter | ||
| Heating system | Heat Exchanger | SUS 304 200KW stainless heating exchanger | |
| Heating burner | Riello G20 diesel oil burner (gas burner is for option) | ||
| Heating productivity | 20000Kcal/hour | ||
| Spray to baking switch | Pneumatic damper | ||
| Chimney ducting | 4 meters chimney ducting and one chimney elbow | ||
| heating temperature | Maximum 80ºC | ||
| fuel consumption | 6-8L/vehicle | ||
| Lighting system | Ceiling lighting | 8 Units, each 4 * 16.5W LED lamps. | |
| Side lighting | 8 Units, each 2 * 16.5W LED lamps. | ||
| Illumination | 1200LUX | ||
| Control system | Switch controlling system | Spraying & baking switch, lighting switch, timer, temperature controlling switch, emergency stop, breakdown alarm, failure alarm, pressure gauge | |






Send Message





















