Model NO.
K104
Elevator Door
Center Opening Door
Door Knife
Single
Deceleration Device
With Deceleration Device
Attendant
Without Attendant
Elevator Type
Passenger Elevator
Machine Room Type
with Machine Room
Door Open Way
Center Open, Side Open
Door Open Size
700mm~1300mm
Door Height
2100mm (Standard)
Main Power
AC 380V, 3 Phase 50Hz
Lighting Power
AC 220V, 1 Phase, 50Hz
Production Time
15~30 Days
Warranty
18 Months After Shipment
Product Standard
En 81-20: 2014, En 81-50: 2014
Transport Package
Plywood Box
Specification
EN81, GB7588-2003
Trademark
syney or OEM
Origin
Hangzhou, Zhejiang
HS Code
8428101090
Production Capacity
11000 Sets Per Year
Driving Type:
AC Elevator
Capacity:
500-1000kg
Persons:
11 - 19
Speed:
1.00 - 2.00m/s
Control Mode:
Collective Selective Control
Position of Computer Room:
up
Product description
Cheap Price All Stainless Steel Passenger Elevator for Cafeteria
Model: K104
Combined with modern technology and fasion art, Syney passenger elevator satisfies all needs of hotel, office building, shopping mall, etc, and provides safe and comfortable riding experience.
Features
1. Safe and reliable
Syney passenger elevator puts safety the first place, to ensure each passenger's safe delivery to destination.
2. Space configurability
From the view of space saving, Syney passenger elevator make new layout of machiine room, improved the space availability.
3. Energy saving and environment friendly
Syney passenger elevator adopts gearless permanent magnet synchronous machine to save energy and protect environment.
4. High performance
Syney passenger elevator is euipped with stable control system with maximum capacity 1600kg. Intelligent lift dispatching system provides the best solution for customer riding.
5. Free custom-made
Customers can choose their favorite and customized apperance for their own elevators
from aspects of car finish, design, ceiling and floor materials.
Passenger elevator cabin design
Parameters: Passenger Elevator With Machine Room
Note:
Above standard specification is only for reference. If shaft size at jobsite is different , please contact with us, factory will design suitable one according to your parameter.
Manufacturing, Packing and Delivery
From the raw material getting into factory to finished products getting out to customers, Syney has a strict operation system to control each steps.
No rejected raw material will be accpeted!
When raw material comes to factory, QC department will check all the materials, once any fault items found, it will be returned to suppliers at once. Only qualified material will get into raw material warehouse.
Production management
Every week, production department will make the production plan and update the schedule of online products. There is daigital board in each workshop showing the production plan everyday. In this way, from workers to managers all clearly know which project is online now.
Every moring, managers will guide the workers to run for 15 minutes first to refresh. Then check the machines status before operation and check again after one day job.
Packing
All parts are packed in solid plywood boxes, which can stand long time sea shipping and fumigation free. For some important parts like control cabinet, door operator and motor, parts will be covered by a strong film first, with desiccant, before put into boxes.
Quality control
1) All raw materials will be checked before get into warehouse. And bulk electronic product do sampling inspection. All parts must have qualified certificate from suppliers. QC1 is responsible for this.
2) During production stage, QC2 will check commissioning for each elevator, escalator and moving walks.
3) After elevator and escalator finished, QC3 will test the match of elevator motor and control cabinet, and the running condition of escalator and moving walks.
4) After packed, QC4 will check package condition for each parts, and takes photo for further reference.
5) When delivery, QC5 will check if all parts packed in container to avoid any missing, and takes photo for further reference.
Company Profile
Syney Electric (Hangzhou) Co., Ltd. is a professional enterprise integrating R&D, design, manufacture, marketing, installation and customer service. The company applies whole set of advanced equipments and specializes in design and manufacture of products including passenger elevator, panoramic elevator, bed elevator, cargo elevator, home elevator, car elevator, escalator, moving walks, etc. Syney sales network expands to over 50 countries in Europe, Asia, Africa and America.
The enterprise has two manufacturing factories. The registered capital is ¥500,000,000, covering nearly 99000 square meters, with over 80 engineering technicians and nearly 30 senior managers.
Certificates
CE Certificate of Elevator with machine room and Elevator without machine room, and UCMP device
CE Certificate of energy-efficiency of lifts: Grade A
EAC Certificate Elevator with machine room and Elevator without machine room
Projects
Cheap Price All Stainless Steel Passenger Elevator for Cafeteria
Model: K104
Combined with modern technology and fasion art, Syney passenger elevator satisfies all needs of hotel, office building, shopping mall, etc, and provides safe and comfortable riding experience.
Features
1. Safe and reliable
Syney passenger elevator puts safety the first place, to ensure each passenger's safe delivery to destination.
2. Space configurability
From the view of space saving, Syney passenger elevator make new layout of machiine room, improved the space availability.
3. Energy saving and environment friendly
Syney passenger elevator adopts gearless permanent magnet synchronous machine to save energy and protect environment.
4. High performance
Syney passenger elevator is euipped with stable control system with maximum capacity 1600kg. Intelligent lift dispatching system provides the best solution for customer riding.
5. Free custom-made
Customers can choose their favorite and customized apperance for their own elevators
from aspects of car finish, design, ceiling and floor materials.
Passenger elevator cabin design
Parameters: Passenger Elevator With Machine Room
Capacity | Speed | Cabin Size | Shaft Size | Max Travel | Min Floor H | ||||||
DL | V | Width | Depth | Open | Width | Depth | Pit | OH | MRH | Max R | Min D |
(kg) | (m/s) | (mm) | (mm) | (mm) | (mm) | (mm) | (mm) | (mm) | (mm) | (m) | (m) |
630 | 1 | 1400 | 1150 | 800*2100 | 2000 | 1800 | 1500 | 4500 | 2300 | 50 | 2.7 |
1.5 | 1600 | 4600 | 70 | ||||||||
1.75 | 1700 | 4700 | 90 | ||||||||
800 | 1 | 1350 | 1400 | 800*2100 | 2000 | 2100 | 1500 | 4500 | 2300 | 50 | |
1.5 | 1600 | 4600 | 70 | ||||||||
1.75 | 1700 | 4700 | 90 | ||||||||
2 | 2050 | 2100 | 1900 | 5000 | 2500 | 100 | |||||
2.5 | 2100 | 5200 | 120 | ||||||||
1000 | 1 | 1600 | 1400 | 900*2100 | 2200 | 2100 | 1500 | 4500 | 2300 | 50 | |
1.5 | 1600 | 4600 | 70 | ||||||||
1.75 | 1700 | 4700 | 90 | ||||||||
2 | 2300 | 2100 | 1900 | 5000 | 2500 | 100 | |||||
2.5 | 2100 | 5200 | 120 | ||||||||
1150 | 1 | 1800 | 1400 | 1000*2100 | 2400 | 2100 | 1500 | 4500 | 2300 | 50 | |
1.5 | 1600 | 4600 | 70 | ||||||||
1.75 | 1700 | 4700 | 90 | ||||||||
2 | 2500 | 2150 | 1900 | 5000 | 2500 | 100 | |||||
2.5 | 2200 | 5200 | 120 | ||||||||
1350 | 1 | 2000 | 1500 | 1100*2100 | 2600 | 2200 | 1500 | 4500 | 2500 | 50 | |
1.5 | 1600 | 4600 | 70 | ||||||||
1.75 | 1700 | 4700 | 90 | ||||||||
2 | 2700 | 2250 | 1900 | 5000 | 100 | ||||||
2.5 | 2200 | 5200 | 120 | ||||||||
1600 | 1 | 2000 | 1700 | 1100*2100 | 2600 | 2400 | 1500 | 4600 | 2500 | 50 | |
1.5 | 1600 | 4700 | 70 | ||||||||
1.75 | 1700 | 4800 | 90 | ||||||||
2 | 2700 | 2450 | 1900 | 5100 | 100 | ||||||
2.5 | 2200 | 5300 | 120 |
Note:
Above standard specification is only for reference. If shaft size at jobsite is different , please contact with us, factory will design suitable one according to your parameter.
Manufacturing, Packing and Delivery
From the raw material getting into factory to finished products getting out to customers, Syney has a strict operation system to control each steps.
No rejected raw material will be accpeted!
When raw material comes to factory, QC department will check all the materials, once any fault items found, it will be returned to suppliers at once. Only qualified material will get into raw material warehouse.
Production management
Every week, production department will make the production plan and update the schedule of online products. There is daigital board in each workshop showing the production plan everyday. In this way, from workers to managers all clearly know which project is online now.
Every moring, managers will guide the workers to run for 15 minutes first to refresh. Then check the machines status before operation and check again after one day job.
Packing
All parts are packed in solid plywood boxes, which can stand long time sea shipping and fumigation free. For some important parts like control cabinet, door operator and motor, parts will be covered by a strong film first, with desiccant, before put into boxes.
Quality control
1) All raw materials will be checked before get into warehouse. And bulk electronic product do sampling inspection. All parts must have qualified certificate from suppliers. QC1 is responsible for this.
2) During production stage, QC2 will check commissioning for each elevator, escalator and moving walks.
3) After elevator and escalator finished, QC3 will test the match of elevator motor and control cabinet, and the running condition of escalator and moving walks.
4) After packed, QC4 will check package condition for each parts, and takes photo for further reference.
5) When delivery, QC5 will check if all parts packed in container to avoid any missing, and takes photo for further reference.
Company Profile
Syney Electric (Hangzhou) Co., Ltd. is a professional enterprise integrating R&D, design, manufacture, marketing, installation and customer service. The company applies whole set of advanced equipments and specializes in design and manufacture of products including passenger elevator, panoramic elevator, bed elevator, cargo elevator, home elevator, car elevator, escalator, moving walks, etc. Syney sales network expands to over 50 countries in Europe, Asia, Africa and America.
The enterprise has two manufacturing factories. The registered capital is ¥500,000,000, covering nearly 99000 square meters, with over 80 engineering technicians and nearly 30 senior managers.
Certificates
CE Certificate of Elevator with machine room and Elevator without machine room, and UCMP device
CE Certificate of energy-efficiency of lifts: Grade A
EAC Certificate Elevator with machine room and Elevator without machine room
Projects
Send Message