Truck Spray Booth WLD12000 Configuration
Wallboard | Sandwich style EPS (epispastics polystyrene) 75mm thickness. Colorful steel skin boards 0.476mm thickness. Galvanized steel roof panel. |
Door | 4 pcs of front doors with special rigid frame. Size: 4000(w) x 4800(h). 2 pc of emergency door. |
Air Intake System (2sets) | Each set consists of 2x5.5kw intake fan. Total 4 units of 5.5kw intake fan. BELIMO 20N electric damper. |
Air Exhaust System (2set) | Each set consists of 1x7.5kw exhaust fan. Total 2 units of 7.5kw exhaust fan. Multi-layer fiberglass filter. Exhaust air from basement or two sides of wallboard. |
Air Pipe | Made of Glavanized steel sheet. Consisted of 4 pieces of straight pipe 750*750*1000,and 1 piece of below . |
Heating System (2set) | Each set consists of 1 units Italy Riello G20 diesel burner 200000Kcal/h. Total 2 units of burners,400000Kcal/h.The heat exchanger is made of 1.5mm thickness stainless steel which features more heat dissipating surface, better heat exchange and better burner efficiency |
Lighting System | Ceiling light has 16 units x 4pcs of 15w lamps. Side light has 18 units x 4pcs of 15w lamps. Total 136 pcs of 15w lamps. 900 Lux |
Air Purification | Dual filtering structure. It can capture granules larger than 10μm. Ceiling filter capture granules bigger than 5μm. Multilayer glass fiber. The air cleanliness in the working environment can reaches 98%. |
Control Box | Microcomputer control panel. CHINT electronic components.Equip with overheat , overload & shortcircuit protected, saft and reliable. easy to control and maintain. |
FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods by thicker bubble paper, some of them are packed by carton.
Q2. What is your terms of payment?
A: By T/T, 30% as deposit for production, and 70% balance before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: Normally our quotation is under FOB Guangzhou, but we also accept EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 10 to 15 days after receiving full payment. If your voltage is different from 380V/3PH/50Hz, the delivery time will be around 20 days for custom-made motors or electric components.
Q5. Can you produce according to the technical drawings?
A: Yes, we can produce by your technical drawings or requirements. We can make drawings for you.
Q6: How do you make our business long-term and good relationship?
A1. We keep good quality and competitive price to ensure our customers benefit ;
A2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.