Spray Booth WLD6200 Configuration
Wallboard | Sandwich style EPS (epispastics polystyrene) 50mm thickness. Galvanized steel roof panel. |
Basement | Galvanized steel sheet and square steel pipe construction. 2 rows of grids with floor filter & 3 rows ofcheckered plates. 2 pieces of ramps. |
Door | 3 pcs of luxury front doors with 0.8mm thickness colorful steel skin. Size: 3000(w) x 2600(h). 1 pc of emergency door. Watching window with aluminum frame. |
Air Circulation System | 2x3kw intake fan,1x4kw exhaust fan. BELIMO 20N electric damper. |
Air Pipe | Made of Glavanized steel sheet. Consisted of 4 pieces of straight pipe 750*750*1000,and 1 piece of below . |
Burner | Italy Riello G10 diesel burner, 100000Kcal/h. The heating time 7-9min(20-60.C). Max. temperature at 80.C.Fuel consumption is 4-5kg/vehicle. |
Heat Exchanger | Made of stainless steel. The heat exchange rate reaches 85%. |
Lighting System | Ceiling light has 24 pcs of 16w LED lamps. 800 Lux. |
Air Purification | Dual filtering structure. The primary filter is M pattern nonwoven filter bags. It can capture granules larger than 10μm. Ceiling filter capture granules bigger than 5μm. Multilayer glass fiber. The air cleanliness in the working environment can reaches 98%. |
Pollution Control System | Multi-layer fiberglass filter. |
Control Box | Microcomputer control panel. CHINT electronic components.Equip with overheat , overload & shortcircuit protected, saft and reliable. easy to control and maintain. |
FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods by thicker bubble paper, some of them are packed by carton.
Q2. What is your terms of payment?
A: By T/T, 30% as deposit for production, and 70% balance before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: Normally our quotation is under FOB Guangzhou, but we also accept EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 10 to 15 days after receiving full payment. If your voltage is different from 380V/3PH/50Hz, the delivery time will be around 20 days for custom-made motors or electric components.
Q5. Can you produce according to the technical drawings?
A: Yes, we can produce by your technical drawings or requirements. We can make drawings for you.
Q6: How do you make our business long-term and good relationship?
A1. We keep good quality and competitive price to ensure our customers benefit ;
A2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.