Model NO.
523
Testing Equipment Type
Car Fault Detector
Certification
CE, RoHS, ISO
Update Method
by Internet
Condition
New
Standard
Standard
Application
Mental Parts
Certificate
ISO:9001 2008
Drawing Format
STP, Prt, Dwg, JPG, Pdf, Tiff, PNG
Software
Catia, Ug, CAD
Technical Requirements
According to Your Provided Technical Standards
Accuracy for Datum Hole
± 0.05mm
Accuracy for Other Profiles
± 0.1 mm;
Trade Term
Fob Shenzhen China
Production Leadtime
15~45 Working Days After Confirming The 3D Data
Trademark
Xiesheng
Transport Package
Wooden Case
Specification
1200*700*380
Origin
Dongguan Guangdong China
HS Code
90318090
Product Description
This is made for the front of the car.The materials is used steel 45#(for the basis) and some fiber carbon for skeleton and Bakelite materials 5166 (for the surface) and others.The leadtime will be in 30 days according to the complicated of the configuration and the design confirmation.It is used the wooden crate for the checking fixture.could ship via DHL and other forwarder on the customer requirement.
1.What about the working flow?
Received the purchasing order------Design------Confirming the drawing/solutions------Prepare the materials------CNC------CMM------assembling------CMM------Inspecting------(3rd parts inspections if need)------Package(with wooden)------delivery
2.What is the lead time for the product after confirm the drawing?
Normally,the leadtime is 15-25days,for specially complicate parts,the lead time will be 45days.
3.What kinds of software could support for design?
UG8.0,UG10.0,Catia V5 for 3D,CAD 2007 for 2D.
4..What about the machines?
Machine list is below:
1.What about the working flow?
Received the purchasing order------Design------Confirming the drawing/solutions------Prepare the materials------CNC------CMM------assembling------CMM------Inspecting------(3rd parts inspections if need)------Package(with wooden)------delivery
2.What is the lead time for the product after confirm the drawing?
Normally,the leadtime is 15-25days,for specially complicate parts,the lead time will be 45days.
3.What kinds of software could support for design?
UG8.0,UG10.0,Catia V5 for 3D,CAD 2007 for 2D.
4..What about the machines?
Machine list is below:
NO | Name | Brand/manufacturer | Type | Quantities(Set) | Remark | |||||
1 | CNC | Dingtai | 850 | 4 | ||||||
2 | CNC | Goodly | 1050 | 2 | ||||||
3 | CNC | Hartford | 1580 | 1 | ||||||
2 | lathe | Guangzhou | C6132A | 4 | ||||||
3 | Milling | Kunlun | 4 | 8 | ||||||
4 | Grinder | HYFAIR | 4 | |||||||
5 | CMM | Leader | 2 | |||||||
6 | CMM | Sirui | 1 | |||||||
7 | CMM | China | 1 |