80kw 90kw 120kw 160kw DC Quick Charging Double Plug with 5 Meters Cable New Energy Electric Vehicle Charging Station, Car Battery Charger, Electric Vehicle Charging Station
| Supplier | Nanjing Kangni New Energy Auto Part Co., Ltd. |
|---|---|
| Price | $ 7000.00 / Pieces |
| Availability | In Stock |
| Mini Order: | 2 Pieces |
Product detail
| Type | KY-DC-30-60KW | Harmonic content THD | APP payment / credit card payment / scan code payment |
| ated power | 30KW 40KW 50KW 60KW | Charging mode | Ethernet 2/3/4G (optional) |
| Input Voltage | 380V±20% | payment method | Automatically charge/select charging power/select charging amount/ select charging time |
| The output voltage | 200V-750V | Measurement accuracy | 0.5 |
| Working humidity | 5%-95%, no condensation | Protection level | IP54 |
| Input frequency | 45~65Hz | Working altitude | <3000m |
| safety standard | 100/000 hours | MTBF | 30,000 hours |
| Current limit protection value | ≥110% | Cable Length | 5m |
| Stabilization accuracy | ≤±0.5% | Warranty | 24 months |
| Steady flow accuracy | ≤±1% | Communication Interface | 7 inch LCD color display touch screen |
| Ripple factor | ≤±0.5% | Executive standard | DIN70121/ISO15118/IEC61851-23.IEC61851-24 |
| effectiveness | ≥94.5% | Operating temperature | -25ºC~+50ºC |
| HMI | ≤5% (above 50% load) | MTBF | 100,000 hours |
| Power factor | ≥0.99 (above 50% load) | Protection level | IP54 |
| Wiring method | Bottom in and bottom out | cooling method | Forced air cooling |
| Noise control | ≤60dB | Installation method | Floor-standing |
| Brand name | KangNi | place of origin | Jiangsu China |
With brand-new design and solidly built high-strength ABS plastic, unsurpassed quality will be presented, even to bear the weight of a car, which was already been tested.
Q1. What is your terms of packing?
A: Generally, we pack our goods in brown cartons. If you have legally registered patent we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of delivery?
A: FOB, CFR, CIF, DDU.
Q3. How about your delivery time?
A: Generally, it will take 5 to 25 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q4. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings.
Q5. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Q7: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit;
A:2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.