Dnv 2.7-1 Standard 12 or 16 Nitrogen Gas Cylinder Offshore Bottle Rack
| Supplier | Tianjin LongTeng International Trade Co., Ltd. |
|---|---|
| Price | $ 3500.00 / Pieces |
| Availability | In Stock |
| Mini Order: | 10 Pieces |
Purchase details
Payments:
Tax:
Tax Included
Returns & Refunds:
Eligible for refunds within 30 days of receiving products.
returns and refunds
Product detail
OFFBR 16BOTTLE
12/16 Cylinder Gas Bottle
JIS
-20 Degree Celsius
1 PC
Yes
Dnv 2.7-1 & En 12079 Standard
Non Package
5ft
China
73110090
Product Description
12 or 16 Offshore Cylinder Gas Bottle Rack
Offshore cylinder racks are designed to carry cylinders bottles. There are several types for 12/16/8 cylinders.
It could be customized design. DNV sling is available if request. Optional type: 4 legs/5 legs.
Material: JIS SPA-H/ GB Q345D,E36
Surface Treatment: painted / galvanized with high anti-corrosion performance & compliant with environment protect trend.
Standard: DNV2.7-1:2006 and EN12079-2006 Standard
Design Temperature: -20 °C/-40 °C
For Cylinder Type: Oxygen, DA, Argon. CO2 etc
Comes in Multiple Storages Capacity: 4/6/8/12/16/24 cylinder racks
Offshore Gas Bottle Racks Photos
Painted Gas Bottle Racks
Offshore Cylinder Gas Bottle Rack Dimension
| Dimensions | MM | FT | |
| External | Length | 1,450 | 4'9" |
| Width | 1,240 | 4'1" | |
| Height | 2,250 | 7'4" | |
| Internal | Length | 1,200 | 3'11" |
| Width | 1,020 | 3'4" | |
| Height | 1,980 | 6'6" | |
| Inside Cubic Capacity | CU.M | CU.FT | |
| 2.42 | 85 | ||
| KG | LB | ||
| Maximum Gross Weight | 3,320 | 7,320 | |
| Tare Weight | 820 | 1,810 | |
| Maximum Payload | 2,500 | 5,510 | |
CSC Certificate
FAQ:
Q: Can I get 1 pc of offshore cylinder gas bottle rack?
A: Sure. One sample is available.
Q: How can you ensure your quality? Any approval?
A: Our offshore gas bottle rack is designed and fabricated according to DNV 2.7-1 and EN 12079 standard. It have approval the ISO standard and classification society.
Q: What about the payment terms?
Our payment term is based on your order amount.
Usually we accept 40%TT in advance, the balance before shipment.
Q: What about delivery date?
This is basis on the quantity you ordered. Usually it takes 45 days to fabricate and approval for CSC certificate.