Brand-and-New Pep-Perl+Fu-Chs-Nbb20-U1-A2-V1 Inductive-Block-Style-Proximity Sensor-PNP Output-20mm Detection-IP68 IP69K Good-Price
| Supplier | Energy Technology Co., Ltd. (Shenzhen) |
|---|---|
| Price | $ 156.70 / Pieces |
| Availability | In Stock |
| Mini Order: | 10 Pieces |
Purchase details
Payments:
Tax:
Tax Included
Returns & Refunds:
Eligible for refunds within 30 days of receiving products.
returns and refunds
Product detail
NBB20-U1-A2-V1
Plastic
CE
Non-Customized
12 Months
3-4 Days
Inductive
Block
PNP
20mm
4-Pin M12 Connector
30V
Flush
200mA
Polyamide
P+F
CTN Box
Standard
Germany
Product Description
Our main focus is to provide customers with products and solutions for instrumentation, automation and optimization of industrial processes, such as: Programmable logic controller (PLS's), Variable frequency drives (VFD's), Human machine interface (HMIs), inverter/servo, relay, sensor, switch, IGBT module, power supply, connector and cable, LCD panel, fuse, button etc.
We have committed to the automation and electrical area for 8 years with rich experience in exporting. And we offer a wide range of products of premier brands in this area:
1. Premier brands : Sie-mens, Len-ze, Om-ron, AB, Turck, IFM, Yaskawa, Si-ck, Pi-lz, Key-ence, AB-B, Ea-ton, Fes-to, Mo-xa, Schnei-der, Phoe-nix, S-ew, Mitsu-bishi etc.
2. Brand-new, unused, unopened, undamaged item in its original packaging.
3. We are capable to provide a quick and convenient shopping experience for customers.
Product description
Inductive sensor NBB20-U1-A2-V1
- Sensor head bidirectional and rotatable
- 20 mm flush
- 4-wire DC
- 4 LEDs indicator for 360° visibility
Product Show
Have thousands of inverters, servos, PLCs, encoders, switches, buttons, connectors, sensors, fans, cables, Relays for frequency converter inverter machine, IGBT power module, VFD/VSD, power supply and HMIs in stock.
Shipment: UPS, DHL, FEDEX, TNT, ARAMEX, EMS
Payment: T/T
Leadtime: some stock parts can ship out within 2days. Some is 3-5days for booking. But high power and special parts should be weeks.
If any need, pls contact us freely.