Manufacturer Diesel Articulated 5ton All-Terrain Forklift for Construction Site, 5ton Hydraulic Forklift, Diesel Forklift
| Supplier | Qingdao Beiji Heavy Industry Co., Ltd. |
|---|---|
| Price | $ 11400.00 / Piece |
| Availability | In Stock |
| Mini Order: | 1 Piece |
Purchase details
Payments:
Tax:
Tax Included
Returns & Refunds:
Eligible for refunds within 30 days of receiving products.
returns and refunds
Product detail
Model NO.
G940
Lift height
3000~5000mm
Condition
New
Transport Package
Bare Packaging
Specification
5700X2000x2850mm
Trademark
Lehman
Origin
China
HS Code
8429510000
Production Capacity
1000 Pieces/Year
After-sales Service:
Free Delivery of Accessories, Video Technical Guid
Warranty:
1 Year
Cab Location:
Not Adjustable
Type:
Diesel Forklift
Load Capacity:
1T - 5T
Fuel:
Diesel
Performance | Parameter |
| Model | G940 |
| Rated Load | 5000kg |
| Machine Weight | 5300kg |
| Engine Model | YN38GBZ |
| Rated Power | 76kw |
| Tyre Size | 1670-20 |
| Unloading Height | 4m |
| Load center Distance | 500mm |
| Overall Size | 5600*2000*2850mm |
| Minimum turning radius | 4996mm |
| Fork tooth length | 1220mm |
We have our own spare parts departments and warehouse.We can satisfy your demand within 2-7 days
2. After-sale:
We have our own overseas after-sales engineering team,can give our customer the best servies to avoid your trouble back at home.
3. warranty
1 year warranty from the date of receiving the loaders.
During Warranty, if there is any part broken because of quality problem(except easy-damaged parts), send us detailed pictures, then we will send good/ new parts for your replacements.
Q1:Are you manufacture or trader?
A1:We are manufacture of construction machines,agriculture machines and power press machines. Actually, we produce most of the parts in our own factory for better cost and quality control.
Q2: What is your terms of payment?
A: T/T 30% as deposit,and 70% before delivery. We"ll show you the photos of the products and packages before you pay the balance.
Q3: What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4: How about your delivery time?
A: Generally, it will take 30 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order. Sometimes we have some in stock.